Presentation is loading. Please wait.

Presentation is loading. Please wait.

N. Baboi, DESY EuCARD SRF, HOM-Meeting, 4 th Quarter, Aug. 25, 2010 Task 5.1 BPM-HOM 4 th Quarter (Apr.-Sep. 2010) Activity this period Participation to.

Similar presentations


Presentation on theme: "N. Baboi, DESY EuCARD SRF, HOM-Meeting, 4 th Quarter, Aug. 25, 2010 Task 5.1 BPM-HOM 4 th Quarter (Apr.-Sep. 2010) Activity this period Participation to."— Presentation transcript:

1 N. Baboi, DESY EuCARD SRF, HOM-Meeting, 4 th Quarter, Aug. 25, 2010 Task 5.1 BPM-HOM 4 th Quarter (Apr.-Sep. 2010) Activity this period Participation to conferences and schools Meetings Status of electronics design Outlook Nicoleta Baboi

2 N. Baboi, DESY EuCARD SRF, HOM-Meeting, 4 th Quarter, Aug. 25, 2010 Activity this Semester Work made in this period  HOM measurements without beam in ACC39 in FLASH April full set of spectra, all combinations, 3 - 8GHz active participation of colleagues from Rostock  HOM spectra with beam July full set of spectra from 3.5 to 10GHz software and hardware by Pei, together with Bastian  Pei’s talk in the international meeting today Data analysis  analysis of single cavity data (measurements at FNAL)  analysis of FLASH data on-going Electronics  contact to FNAL, interested to built the electronics

3 N. Baboi, DESY EuCARD SRF, HOM-Meeting, 4 th Quarter, Aug. 25, 2010 Conferences/Schools Conferences  IPAC, Japan  LINAC 2010, Sep., Japan participation of Pei paper with first beam measurements Schools for Pei  RF for Accelerators, Denmark  CAS, Introductory level, Sep., Bulgaria  Courses at Manchester University / Cockcroft Institute various subjects on-line participation

4 N. Baboi, DESY EuCARD SRF, HOM-Meeting, 4 th Quarter, Aug. 25, 2010 Meetings this Semester EuCARD Task 5 meetings: April 7-9: with the occasion of the EuCARD SRF meeting at Cockcroft Institute today (on-line) International meetings July 5: meeting on data analysis –new participation of RHUL in the project July 13: meeting on HOM electronics –collaboration with FNAL today: meeting on data analysis, beam measurements and electronics design –participation of all involved in project

5 N. Baboi, DESY EuCARD SRF, HOM-Meeting, 4 th Quarter, Aug. 25, 2010 Status of the Electronics Design Interest to built electronics by FNAL  based on experience with electronics for cavity BPMs at KEK  XFEL would need uTCA based design  due to time and resources constraint, design for FLASH will be (most likely) VME based  further discussion in international meeting today

6 N. Baboi, DESY EuCARD SRF, HOM-Meeting, 4 th Quarter, Aug. 25, 2010 Outlook Electronics design  based on measurements with beam  need some more discussions Possibility to ask for beam time for Sep.  limited total time (2 weeks for all FLASH studies)  Pei is not here Beam time in Jan  extensive studies


Download ppt "N. Baboi, DESY EuCARD SRF, HOM-Meeting, 4 th Quarter, Aug. 25, 2010 Task 5.1 BPM-HOM 4 th Quarter (Apr.-Sep. 2010) Activity this period Participation to."

Similar presentations


Ads by Google