Presentation is loading. Please wait.

Presentation is loading. Please wait.

Success of timing in FACET : Electro-Optic Sampling Yunfeng Xi, Aihua Deng, Oliver Karger, Alexander Knetsch, Grace Manahan, Bernhard Hidding, James Rosenzweig.

Similar presentations


Presentation on theme: "Success of timing in FACET : Electro-Optic Sampling Yunfeng Xi, Aihua Deng, Oliver Karger, Alexander Knetsch, Grace Manahan, Bernhard Hidding, James Rosenzweig."— Presentation transcript:

1 Success of timing in FACET : Electro-Optic Sampling Yunfeng Xi, Aihua Deng, Oliver Karger, Alexander Knetsch, Grace Manahan, Bernhard Hidding, James Rosenzweig Sep. 15, 2015 La Biodola, Isola d’Elba

2 E210 Collaboration

3 Timing: A key to E210 success 150 fs 5x10 16 cm -3 150 um 500 fs 5x10 17 cm -3 47 um 150 fs B. Hidding et al., PhysRevLett.108.035001

4 Electro-Optic Sampling (EOS) Intense electric field of e-beam induces a birefringence which rotates probe’s polarization. e bunch Phase delay S. Casalbuoni et al., Phys. Rev. ST Accel. Beams 11, 072802 (2008)

5 Electro-Optic Sampling (EOS) The position of signal, where laser crosses with crystal indicates the time of arrival of ebeam. The width of signal is related to longitudinal profile of ebeam. A. L. Cavalieri et al., PhysRevLett.94.114801(2005)

6 FACET experiment area

7 EOS_Lo Probe line monitor IPOTR 1 E224_Trans E210_Focus EOS_Hi IPOTR 2 upstream EOS downstream EOS and injection point cube 1 cube 2 cube 3cube 4cube 5 setup at FACET FACET experiment area main injection laser sampled probe laser

8 Upstream EOS layout CCD_HI CCD_LO e-beam EO crystal Delay stage Plasma Main Laser Pulse EOS Probe Pulse 45° Vertical polarization Analyze r 1cm 50µm x 1cm x 1cm (110) cut, GaP 500µm x 1cm x 1cm, (110) cut, ZnTe YAG e-

9 EOS signals Shadow signal

10 Laser timing scan IR laser ebeam

11 Arrival timing jitter Clocked FACET laser timing jitter for the first time

12 Phase ramp effect Phase ramp scan from 47° to 52°. 50 shots are taken on each step. Timing delay is plotted relative to first step of each scan.

13 DS-1 for EOS DS-2 for TH TH injection point MgF2 window New E210 interaction region design

14 Summary FACET laser and e-beam have been synchronized at ~100 fs. We calibrated effect of phase ramp on FACET laser relative timing to ebeam. We are designing new EOS layout based on new injection chamber.


Download ppt "Success of timing in FACET : Electro-Optic Sampling Yunfeng Xi, Aihua Deng, Oliver Karger, Alexander Knetsch, Grace Manahan, Bernhard Hidding, James Rosenzweig."

Similar presentations


Ads by Google