1 OHIO River-Net  Objectives  Proposed Network  European RIS Example  Project Plan

2 Objectives 1 Network infrastructure specification 2 2 Potential business applications 3 ROI analysis 4 Computer simulations of the most important applications

3 Understanding Players OHIO RIS USCGUSACE PPC Shippers/ Receivers Barge Lines Terminal Operators

4 Proposed Network

5 European RIS Features Waterway Charges & Dues Fairway Information Services Traffic Management Calamity Abatement Service Port &Terminal Management Cargo Management

6 RIS Features  Fairway Information Services  Provide information about the use and status of the inland waterway infrastructure  Support strategic navigation decision-making (plan and monitor a trip).  Target User: Barge lines

7 RIS Features  Traffic Information and Management Services  Strategic/tactical traffic information  Waterway administration for safe navigation  Vessel Traffic Service (VTS) »Accidents prevention by means of shore based monitoring  Lock and Bridge Planning »Reduction of waiting time and smoothing of the traffic flow  Target User: Barge Lines, USCG

8 RIS Features  Calamity Abatement Service  Register vessels at the beginning of each trip and update data during the voyage  In case of accident, immediate and expedited measures to rescue the vessels thanks to the data  Target User: Barge Lines, USCG

9 RIS Features  Port and Terminal Management  ETA( Estimated Time of Arrival) information of approaching vessels supports the overall terminal utilization and smooth passage of vessels  Reduction for transshipment time  In case of insufficient terminal capacities, the terminal operator inform his Requested Time of Arrival (RTA).  Target User: Barge Lines, Terminal Operator

10 RIS Features  Cargo and Fleet Management  Detailed information on the cargo transported  Information on the vessels and the fleet  Target User: Barge Lines, USACE

11 RIS Features  Waterway Infrastructure Charges and Harbor Dues  Use of voyage data to automatically calculate charge and initiate invoicing procedures  Target User: Government

12 Project Plan Post Demo Review Demo ROI Identify Business Services Design Network Infra. Requirement Analysis Scope Definition

13 CMU River-Net Project Member List NameName (Eng)Cell PhoneEmail Sunkyung ParkSunny412 310 2305sunkyung@andrew.cmu.edu Sungju ChoJoe412 335 9713sungjuc@andrew.cmu.edu Yunsuh ChunYun412 848 6918ychun@andrew.cmu.edu Hyeon YuShawn412 719 6054hyeony@andrew.cmu.edu Hyunsu JunSue412 841 1849hyunsuj@andrew.cmu.edu Yi-Chan HoYi-Chan347 249 7658yichanh@andrew.cmu.edu

14 Q&A