PowerPoint Title Sub heading if required Northern Powerhouse Rail Freight meeting 17 th May 2016.

Similar presentations


Presentation on theme: "PowerPoint Title Sub heading if required Northern Powerhouse Rail Freight meeting 17 th May 2016."— Presentation transcript:

1 PowerPoint Title Sub heading if required Northern Powerhouse Rail Freight meeting 17 th May 2016

2 Powerhouse Rail Network Body copy

3 Conditional outputs Body copy Reduced journey times between cities Increased capacity to cater for economic growth forecasts Minimum city to city connectivity frequencies For NECA starting point 4 additional trains per hour cutting the journey time Newcastle to Leeds from 90 minutes to 60 minutes and providing 100% to 130% capacity increase

4 Other related rail studies / influences Body copy HS2 East Coast Route Study North East Route Study TfN Local Strategic Connectivity workstream TfN Freight workstream SEP projects / aspirations

5 Leeds to Newcastle Specifics Body copy increased rail services Capacity uplift 100% to 130% Reduce journey times from 90mins to 60mins Minimum frequency 4tph Infrastructure and Station workshops as part of EC route study Freight Trans-Pennine CrossCountry LDHS Local HS2 NPR

6 CONCEPT A and B Concept B (northern) New or upgraded route Concept A Concept B (southern) Manchester Vic Manchester Pic Manchester Airport Liverpool New Northern Powerhouse Rail route Upgraded current NR route (could be very long cut-offs) Current NR route HS2 Link provided to access HS2 route Sheffield (Midland) Leeds Newcastle Hull

7 CONCEPT C New or upgraded route Manchester Vic Manchester Pic Manchester Airport Liverpool New Northern Powerhouse Rail route Upgraded current NR route (could be very long cut-offs) Current NR route HS2 Link provided to access HS2 route Sheffield (Midland) Leeds Newcastle Hull

8 North East issues Body copy Quantum of trains proposed on existing lines difficult (expensive) to achieve (including Freight) Removal of constraints / New line / significant cut offs / upgrade Leamside Station capacities Cost – vs – Benefits of calling at other centres of economic significance

9 Removal of Constraints / New lines / Cut Offs / Upgrades Body copy Options under consideration Sections of 4 track railway Reduce delay at Junctions Reduce delay at Intermediate Stations Use of Leamside

10 Autumn Statement / Spring Statement Aim to sift options to provide small number of alternatives on each corridor for high level model testing / engineering feasibility / costing. Agreed methodology of comparing corridor options and ranking them. Agreed methodology for sequencing between corridors. East Coast route study to publish for consultation in December Programme milestones

11 Any Questions