Friday, Feb 12, 2010 Accelerator Status1 Accelerator Week in Review Part I: Regular 9am Scheduling Meeting –Crew Chief Summary –24 hour machine summaries.

Similar presentations


Presentation on theme: "Friday, Feb 12, 2010 Accelerator Status1 Accelerator Week in Review Part I: Regular 9am Scheduling Meeting –Crew Chief Summary –24 hour machine summaries."— Presentation transcript:

1 Friday, Feb 12, 2010 Accelerator Status1 Accelerator Week in Review Part I: Regular 9am Scheduling Meeting –Crew Chief Summary –24 hour machine summaries and study requests – Machine Coordinators –Operational Plan –Mary Convery Part II: Weekly Machine Reports –Weekly Operational Summary – Cons – User, Pbar and Tevatron weekly operational plots Collider shot summary NuMI beam summary MiniBooNE beam summary –Weekly Machine Summaries – Machine Coordinators

2 Friday, Feb 12, 2010 Accelerator Status2

3 Friday, Feb 12, 2010 Accelerator Status3 LFR4 PA change out

4 Friday, Feb 12, 2010 Accelerator Status4 TRF1 tripped off TRF3 tripped off

5 Delivered Luminosity [1/pb]Key Store # Available Pbars Initial Luminosity Avg Delivered Lum Store Duration Store End Abort due toD2 crate ps Weekly Integrated Luminosity Store 7603 162E10 154E30 2562nb -1 8.22hrs Abort Quench A3 due to cryo vacuumTev A-E accessLinac RF station 2 IPA amplifier Hard wire loop interface module at A2 Store 7606 357E10 2488E30 5321nb -1 11.2hrs Abort Store 7610 390E10 296.6 E30 7124nb -1 14.9hrs Planned Store 7611 398E10 256.4 E30 6467nb -1 17.5hrs Planned Store 7612 390E10 285.2 E30 77711nb -1 17.9hrs Planned Store 7613 390E10 297.2 E30 6984nb -1 14.8hrs Planned Store 7614 402E10 301.0 E30 7351nb -1 15hrs Planned Store 7615 392E10 317.5 E30 6723nb -1 12.7hrs Planned CDF/D0 access Store 7616 402E10 306.0 E30 On Going

6 Friday, Feb 12, 2010 Accelerator Status6%

7 Friday, Feb 19, 2010 Accelerator Status7 We have the ability to go up in either proton or pbar intensity as the Tevatron is ready

8 Friday, Feb 12, 2010 Accelerator Status8

9 Friday, Feb 12, 2010 Accelerator Status9

10 Friday, Feb 12, 2010 Accelerator Status10

11 We are not done yet……

12 How do we get back to 350 E30?? The approach that we are taking looks at past performance and compares that to our present conditions to identify point that we have deficiencies.  This will can be done by taking the top 10 store (initial Luminosity ) and parameterizing them. Intensity, emittances and efficiencies  Comparing these values to our current performance. Identify and address problem areas Redefining parameters if needed

13 Main Injector (store 7470) εLεL ε  h /ε  v EfficiencyIntensity Comments MI PBARS MI FW SBD INJ 1.3 eV-s. ≤ 4 π mm- mrad 3.0 π mm- mrad ≥ 95% inj eff ~95% 4 batches EXT <3.1eVsec 3.6 eV-s. ≤ 5 π mm- mrad 3.2 π mm- mrad ≥ 90% driven by coalescing ~92% 4 coalesced batches PROTONS I:BLMON MI FW SBD INJ <1.4 eVsec~15 π mm- mrad trans. 16.3 π mm- mrad ≥ 95% ~98% ~.38-.42 E12 per batch ~.34-.35 E12 per batch 2 batches 7 bunches EXT <3.4 eV-s.ec 3.67eV-s. ≤ 14 π mm- mrad transfer 14.2π mm- mrad ≥ 88% driven by coalescing ~86% ~320-340 E9 ~290-310 E9 2coalesced batches Example

14 Friday, Feb 12, 2010 Accelerator Status14 Recent changes: Recycler Pbar load time shorted Sequencer changes Auto copies for log book RF ready state wait shortened Default TLG shorten to 11 sec from 33 sec Chrom Tunes/coupling Tune tracker being more robust Operator learning curve Proton load Philosophy change (see next side)

15 Proton Loading Non scrape coalesced intensity 340-350e9 Scraped coalesced intensity 300-310e9 Friday, Feb 12, 2010 Accelerator Status15 11 turn tables are now being used Tune for high intensity then dial in intensity and emittance Better consistency Faster load Goal is to keep ahead of demand

16 Proton and Pbar Intensities Friday, Feb 19 2010 Accelerator Status16 Protons Pbars

17 Vertical Emittance ProtonsPbars Friday, Feb 12, 2010 Accelerator Status17 ~2 pi Smaller Growth issue being looked at Store by store ~3-4 pi Larger For every Pi of growth initial Luminously is reduced by ~20-30 E30

18 Long. Emittance Friday, Feb 19, 2010 Accelerator Status18 Protons Pbars

19 Friday, Feb 12, 2010 Accelerator Status19

20 Friday, Feb 12, 2010 Accelerator Status20

21 Friday, Feb 12, 2010 Accelerator Status21

22 Integrated luminosity potential of a store FY09

23 Feb Mar Apr May June July Aug Sept Oct Nov Dec Jan Feb Weekly integrated luminosity (pb- 1 ) Store hours per week Feb Mar Apr May June July Aug Sept Oct Nov Dec Jan Feb Friday, Feb 12, 2010 Accelerator Status23 Weekly integrated luminosity and store hours per week red line goal 52.5 pb -1 /wk

24 Friday, Feb 12, 2010 Accelerator Status24

25 Friday, Feb 12, 2010 Accelerator Status25