Presentation is loading. Please wait.

Presentation is loading. Please wait.

V Review SPARC 4-10-2004 Diagnostic & Control Status G. Di Pirro On behalf control and diagnostic group.

Similar presentations


Presentation on theme: "V Review SPARC 4-10-2004 Diagnostic & Control Status G. Di Pirro On behalf control and diagnostic group."— Presentation transcript:

1 V Review SPARC 4-10-2004 Diagnostic & Control Status G. Di Pirro On behalf control and diagnostic group

2 V Review SPARC 4-10-2004 Diagnostics GUN Emittance BPM Charge Emittance measure RF deflector Energy and Energy spread

3 V Review SPARC 4-10-2004 Final project V. Lollo

4 V Review SPARC 4-10-2004 Target We buy the YAG target and start the design of support

5 V Review SPARC 4-10-2004 Beam Position Monitors will be installed before, between, and after the accelerating structures, as well as in the transport sections before the undulator. BPM system parameter

6 V Review SPARC 4-10-2004 Vacuum pipe diameter47.4mm Stripline diameter39.4mm Stripline angular width~30degree Stripline length13.6cm Characteristic impedance50  Strips thickness1mm Max of transfer impedance2.08  Sensitivity1.255mm/dB pickup design parameter Matched striplines are used in each BPM for the simultaneous readout of the horizontal and vertical positions. The intensity information can also be derived from the sum of the signals.

7 V Review SPARC 4-10-2004 BPM detection

8 V Review SPARC 4-10-2004 Charge monitor Faraday cup: defined Charge monitor from Bergoz ready to order

9 V Review SPARC 4-10-2004 RF deflector Bunch length Emittance Slice Emittance

10 V Review SPARC 4-10-2004 V. Lollo Design is complete Test complete Ready to order

11 V Review SPARC 4-10-2004 Targets All target position are defineted. The target in OTR or cromex. Camera: Basler IEEE1394 camera ordered and arrived Hamamtsu high efficency

12 V Review SPARC 4-10-2004 Bunch length Start the study to define a second method to measure a bunch length (interferometer)

13 V Review SPARC 4-10-2004 Control system

14 V Review SPARC 4-10-2004

15

16 Type of Elements to control Magnet; RF; Vacuum; Diagnostic; Laser.

17 V Review SPARC 4-10-2004 Operating system download Data storage Data base....... Electronic logbook Web information Automatic acquisition....... MagnetVacuumDiagnostic........

18 V Review SPARC 4-10-2004 Using DAFNE Control system software

19 V Review SPARC 4-10-2004

20 Using DAFNE Control system software Dafne front end CPU ported in new configuration Service program under test Starting program under test and some control window under porting and test

21 V Review SPARC 4-10-2004 Control room Ready at the end of October

22 V Review SPARC 4-10-2004 Control room 5 CPU with 2 monitor and two Ethernet connection 10/100/1000 1 server 1 service CPU 1 optical switch CISCO in home 3 switch 10/100/1000 CISCO in home

23 V Review SPARC 4-10-2004 Network

24 V Review SPARC 4-10-2004 Magnet To control a magnet means to control a power supply. 9 Solenoids Modbus protocol 12 Quadrupoles + 8 3 Bendigs 12 Steering correctors Software is imported from Dafne control system

25 V Review SPARC 4-10-2004 RF Modulators: come with an Ethernet interface. It is based on Siemens PLC it send at 10Hz the complete status. Amplifier (Milmega) is remote controlled trough Ethernet Defined number and type of control 50 pulse shape phase and amplitude readout digitizer 15 attenuator and phase shifter motorized 4 analog signal 6 digital I/O

26 V Review SPARC 4-10-2004 Vacuum Pump 24 –3 Analog signal –1 digital input –1 digital output Ethernet as field bus. Vacuumeter 6 –serial interface acquired an Ethernet to serial converter with 8 port software start development software under test

27 V Review SPARC 4-10-2004 Diagnostic Acquisition camera. –Acquisition software installed in TTF2 and working (12 fps on 100Mbit Ethernet) IEEE1394 Flag movement. –Stepper motor. BPM reading. –Ethernet interface Charge monitor reading –Electronic from Bergoz

28 V Review SPARC 4-10-2004 2 PhD student 1 Diagnostic a 1 Control system 1 equivalent people form RF group Full support from DAFNE control group Rome 2 Rome 1

29 V Review SPARC 4-10-2004 Schedule February 2004 definition control room October 2004 full definition of all part of the control system. Half of the 2004 start with the test of some part of the control system OK. End of the year first implementation of the control. October 2004 control room ready


Download ppt "V Review SPARC 4-10-2004 Diagnostic & Control Status G. Di Pirro On behalf control and diagnostic group."

Similar presentations


Ads by Google