The University of Avignon Created in 1303 by Pope Boniface VIII. Closed after the French Revolution in 1793. Reopened in 1963 as a dependency of the University of Marseille. Independent university since 1984.
8
The University of Avignon About 7600 students About 320 professors 4 faculties: Humanities, Biology, Languages, Law and Sciences. 2 Institutes: –Technology –Applied Mathematics and Computer Sciences 15 research laboratories
9
The University of Avignon Experienced in receiving foreign students as a member of Erasmus and Crepuq networks. Special French lessons for foreigners. International Relations Service.
10
Computer Sciences Laboratory Created in 1987 21 permanent researchers 32 Ph.D. students Structured in 5 teams –Networks and Multimedia –Automatic treatment of written languages –Automatic treatment of spoken languages –Human-machine Dialogs –Operational Research and Optimisation
11
The O.R. Team Created in 1998 3 permanents –P. M., C. Artigues, D. Feillet. 2 ATER –C. Mancel, M. Palpant. 4 Ph.D. students –Tran Thi Hue, –A. Linhares, –O. Liess, –T. Garaix.
12
Research Activities
13
Methods: CP/MP Cooperation Schemes Constraint Programming is now widely used in O.R. CP and Mathematical Programming are complementary. Cooperative schemes are useful in some cases !
14
Methods: CP/MP Cooperation Schemes Example of published paper: Demassey S., Artigues C., Michelon P., “Constraint propagation- based cutting planes: an application to the resource-constrained project scheduling problem”, IJOC, 17, 52-65, 2005. Example of work in progress: –Application to the Multi-Knapsack –Collaboration with Manoel Campêlo and William Maia (UFC)
15
Methods: Decomposition Column Generation: –Application to Vehicles Routing Problems. Generalized Bender’s decomposition: –Application to coupled problems.
16
Methods: Decomposition Example of published paper: D. Feillet, P. Dejax, M. Gendreau, “The Profitable Arc Tour Problem: Solution with a Branch and Price algorithm”, to appear, Transportation Science Example of work in progress: –Bender’s Decomposition for a coupled Planning/Scheduling Problem. –O. Liess’s Ph.D. thesis.
17
Methods: Metaheuristics Application to several fields. Exploration of the links between metaheuristics and exact methods.
18
Methods: Metaheuristics Example of published paper: E. Danna, E. Rothberg, C. Le Pape, “Exploring relaxation induced neighborhoods to improve MIP solutions” Mathematical Programming, 102, 71-90, 2005. Example of work in progress: –Links with Resolution Search –M. Palpant’s Ph.D thesis –Collaboration with M. Vasquez (EMA)
19
Problems: 0/1 Quadratic Programming Constrained and unconstrained problems. Exact Method. Linearization techniques.
20
Problems: 0/1 Quadratic Programming Example of published paper: S. Gueye, P. Michelon, “Miniaturized Linearizations for 0/1 Quadratic Problems”, to appear, A.O.R, special issue on “Integer Programming: State-of-the-Art”. Example of work in progress: –Fixation techniques –Collaboration with S. Gueye (University of Le Havre)
21
Problems: Vehicles Routing Exacts and heuristic methods Profitable arcs problems. Preemptive demands problems.
22
Problems: Vehicle Routing Example of published paper: D. Feillet, P. Dejax, M. Gendreau, C. Gueguen, “ An exact algorithm for the Elementary Shortest Path Problem with Resource Constraints: application to some vehicle routing problems”, Networks, 44(3): 216-229, 2004 Example of work in progress –Refinement of column generation techniques for vehicle routing –Collaboration with L-M Rousseau (CRT, Canada)
23
Problems: Scheduling Focus on the Resources Constrained Project Scheduling Problem. Exact and heuristic methods. Extension to other problems.
24
Problem: Scheduling Example of published paper: M. Palpant, C. Artigues, P. Michelon, “Solving the resource- constrained project scheduling problem with large neighbourhood search”, A.O.R, special issue on Metaheuristics, 131, 237-258, 2004. Example of work in progress: –Study of a particular Cyclic Scheduling Problem. –Collaboration with Marcos Negreiros (UECE)