Vermont Yankee. Boiling Water Reactor Reactor Building Carbon steel 370 Ci/m3 Concrete 3.8 Ci/m3 Spent fuel pool.

Similar presentations


Presentation on theme: "Vermont Yankee. Boiling Water Reactor Reactor Building Carbon steel 370 Ci/m3 Concrete 3.8 Ci/m3 Spent fuel pool."— Presentation transcript:

1 Vermont Yankee

2 Boiling Water Reactor

3 Reactor Building Carbon steel 370 Ci/m3 Concrete 3.8 Ci/m3 Spent fuel pool

4 Reactor Vessel and Internals 2.9 Million Ci/m 3

5 Radioactivity as a Function of Time

6 Decommissioning Alternatives Dismantlement – remove all radioactive materials. Terminate license, except for spent fuel and hot core components. In VT, hopefully return to greenfield. Safstor – remove much of external contamination. After cooling 5 years, all fuel in storage casks. Remove cooling water pipes. Seal up reactor internals and wait. Revise license.

7 CT Yankee Dry Storage

8 Dry Storage Cask

9 Cask 1.0

10 Hi-Star 100 Cask

11 Remaining Amts to Collect YearVT Nuclear PwrEntergy 2000 to 2012256.880 Amt in Fund ‘99247.00 Total533.88 Estd Decom Cost 816.6614.6

12 Entergy Misses the Mark

13 TLG Projected Costs to Decom VY

14 What must be done? 1.While the labor force is intact, immediate steps must be taken. VY will have to produce a decom plan for NRC, but we need a site survey now. 2.Safe, careful dismantlement must start asap. No guarantee SAFSTOR will lead to sufficient decom fund. The financial risk is too high. 3.Sufficient funds must be available to dismantle the reactor, dispose of waste, including fuel and bring the VY site to greenfield condition. 4.VT must do an independent economic audit, and ensure the decom fund is fully funded.

15

16 Money in Decom Fund Money at Year End 2001 $297.1 2002 $315.9 2004 $372.8 2006 $416.5 2007 $439.6 2008 $372.0 2009 $428.4 Interest Rate Int rate 6.2% (est) (above cpi) Real cumulative rate 4.2% Average CPI infl rate 2.4% Net rate 1.8% (above cpi)

17 Comparison CT and VT Yankees CT Yankee 619 MWe PWR $871 Million Shutdown 1996 Payments to 2015 DECON VT Yankee 620 MWe BWR $893 Million (estimate) $600 Million (TLG) ?? Shutdown 2012 Pay out to 2019 DECON Rate return 8.85% Amt Trust Fund $420 M