Presentation is loading. Please wait.

Presentation is loading. Please wait.

Ids120h_side. ids120h_top ids120h_iso ids120h_end.

Similar presentations


Presentation on theme: "Ids120h_side. ids120h_top ids120h_iso ids120h_end."— Presentation transcript:

1 ids120h_side

2 ids120h_top

3 ids120h_iso

4 ids120h_end

5 110131_IDS120_xsec

6 110128_IDS120

7 110128_IDS120_study2

8 Superconducting magnets tungsten-carbide beads + water proton beam and mercury jet mercury pool proton dump beam window 2011 target system concept 2010 target system concept

9 110128_IDS120_iso

10 110125_IDS120-1 SC1 SC2 SC3 SC4 SC5 SC6 SC7 SC8 SC9 SC10 SC11 SC12 SC13 SC14 SC15 SC16 SC17 SC18 SC19 RC1 RC2 RC3 RC4 RC5

11 110125_IDS120-2

12 110125_IDS120-3

13 110125_IDS120-4

14 IDS90 IDS100 IDS110 IDS120

15

16

17

18 0 T 5 T 10 T 15 T 20 T 25 T Peak energy deposition at 4 MW, 50 Hz Curves are global fits

19

20

21

22 MARS+MCNP SC3: 0.26 kW SC5: 0.19 kW TOTAL: 0.97 kW

23

24 Shield2e7at11MW.docx


Download ppt "Ids120h_side. ids120h_top ids120h_iso ids120h_end."

Similar presentations


Ads by Google