Presentation is loading. Please wait.

Presentation is loading. Please wait.

RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January 2011 169 Instrument Pre-Environmental Review Safety and Mission.

Similar presentations


Presentation on theme: "RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January 2011 169 Instrument Pre-Environmental Review Safety and Mission."— Presentation transcript:

1 RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January 2011 169 Instrument Pre-Environmental Review Safety and Mission Assurance Jorg Fischer Space Sciences Laboratory University of California, Berkeley

2 RBSP/EFW I-PER 21 January 2011 Fischer 170 Safety, Alerts, and Calibration EFW Boom and Preamp Safety –No safety issues at this time –Safety per EFW Matrix, 7470-9096-05 Revision A, Section 3 –No hazardous ground operations for EFW –UC Berkeley’s EH&S checked test areas –Portable, calibrated Oxygen sensors are available for N2 purge –Test Plan Walk-through Alerts and GIDEP Reports –No Alert impacts at this time –EFW receives Monthly Alerts from GSFC - JHU/APL –238 Alerts received, 238 Alerts closed, 2 Impact – 2 impact closed Calibration Control –All Tools need for testing are in calibration –Calibration Database (195 items tracked for EFW)

3 RBSP/EFW I-PER 21 January 2011 Fischer 171 ESD, Training, Configuration Control ESD Control –ESD Workbenches are clearly Identified –ESD Workbenches are independently certified (RMV Technology) –ESD Control plan per ANSI/ESD S20.20 in place (SSL_QA_0003) –Internal ESD checks per plan –All EFW personnel ESD trained and certified to ANSI/ESD S20.20 Training –All EFW personnel ESD trained and certified to ANSI/ESD S20.20 –All EFW technicians trained and certified to NASA Workmanship Standards Configuration Control –Configuration Control Matrix, typ. shows revision of Schematic, BOM, PWA Gerber, ACI, Unit Name and Serial Numbers, Next Assembly –Latest version of documents and procedures are on the EFW server

4 RBSP/EFW I-PER 21 January 2011 Fischer 172 Traceability, Non-conformance Control Traceability –All EEE parts approved –All Materials Approved –PMPCB process –POs and As built parts List on file –EFW Parts data base Nonconformance Control –Proven, in-place PFR Process (STEREO, RHESSI, THEMIS) –MRB part of this process –PFR – Rework/Repair forms –60 PFRs, All PFRs closed or in closing process. –PFRs on UCB server –PFRs are part of the SSL Lessons Learned Process Shipping Control –Shipping Plan in-place (JHU/APL, UCB/SSL 1/11/11)

5 RBSP/EFW I-PER 21 January 2011 Fischer 173 Summary - Experienced Personnel provide oversight and technical support across all elements of the EFW Project - Mission Assurance Requirements are well defined and comprehensive. - These are traditional requirements for SSL Missions and they are understood. - Systems with experienced personnel are in place and operating. The Mission Assurance team is ready to support RBSP EFW Environmental Tests and shipping of the instrument to JHU/APL.

6 RBSP/EFW I-PER 21 January 2011 Fischer 174 This page intentionally almost blank


Download ppt "RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January 2011 169 Instrument Pre-Environmental Review Safety and Mission."

Similar presentations


Ads by Google