Presentation is loading. Please wait.

Presentation is loading. Please wait.

Grid development at University of Manchester Hardware architecture: - 1 Computer Element and 10 Work nodes Software architecture: - EasyGrid to submit.

Similar presentations


Presentation on theme: "Grid development at University of Manchester Hardware architecture: - 1 Computer Element and 10 Work nodes Software architecture: - EasyGrid to submit."— Presentation transcript:

1 Grid development at University of Manchester Hardware architecture: - 1 Computer Element and 10 Work nodes Software architecture: - EasyGrid to submit jobs to grid. -Babar software installed at AFS -LCG Grid software -Linux platform Important: Web page with all available information: http://www.hep.man.ac.uk/u/jamwer Dr James Cunha Werner

2 EasyGrid: Analysis Submission to Grid Single command:./easygrid dataset_name Perform Handlers management and submission Configurable to achieve user’s requirements Software based in State-machine –Verify skimdata available: If not available perform BbkDatasetTCL to generate skimData. Each file will be a job. –Verify if there are handlers pending If not, script generation (gera.c) with edg-job-submit and ClassAdds, and script execution. Nest for submission policy and optimisation. If yes, verify job status. When the all jobs ended, recover results in user folder. (Prototype)

3

4 Benchmarks The different behavior of electrons, hadrons, and muons can be distinguished. Performing this analysis takes 7 days using one computer 24 hours a day. Using 10 CPUs in parallel, accessed via the Grid, it took only 8 hours. 18,700,000 events !!! Behavior of particles in the BaBar Electromagnetic Calorimeter (EMC )

5 Pi+- N Pi0 decays, with N= 1, 2, 3 and 4 Invariant masses of pairs of gammas, as measured by the EMC, from Pi0 decay produce a mass peak at 135 MeV (the peak in the plot). All other combinations are spread randomly around all energies (background). There were 81,700,000 events in the dataset and it took 4 days to run in production, with 26 jobs in parallel: to run it in one single computer would take more than 3 months.

6 Resonances reconstruction Note the change in resolution between the plots. This is consequence of insignificant branch rate of 4 Pi0 decay.


Download ppt "Grid development at University of Manchester Hardware architecture: - 1 Computer Element and 10 Work nodes Software architecture: - EasyGrid to submit."

Similar presentations


Ads by Google