Presentation is loading. Please wait.

Presentation is loading. Please wait.

Technical Kick off meeting Grosuplje September 22-23 2008 Integration Preparation António Cunha – Pedro Nunes Institute Networking.

Similar presentations


Presentation on theme: "Technical Kick off meeting Grosuplje September 22-23 2008 Integration Preparation António Cunha – Pedro Nunes Institute Networking."— Presentation transcript:

1 Technical Kick off meeting Grosuplje September 22-23 2008 Integration Preparation António Cunha – Pedro Nunes Institute cunha@ipn.pt www.las.ipn.pt Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances Grant Agreement: 223994

2 14 May 2008www.n4c.eu2 Agenda Phase 1 (10 minutes): Sysml overview (idb block) Phase 2 (15 minutes): Identify the system main modules and the communication protocols. – Phase deliverable: N4C global diagram (Sysml) Phase 3 (15 minutes): Identify the main functions and the inputs and outputs of each module – Phase deliverable: “n” Sysml diagrams (one per module), with inputs and outputs Phase 4 (15 minutes): Identify the expected time for each module development and the dependences between each other – Phase deliverable: Integration workplan Phase 5 (45 minutes, optional): Identify the system requirements – Phase deliverable: System requirements Checklist

3 Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances Grant Agreement: 223994 Phase 1: Sysml overview (idb block) 14 May 2008www.n4c.eu3 Time: 10 minutes

4 Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances Grant Agreement: 223994 Phase 2: Identify the system main modules and the communication protocols. 14 May 2008www.n4c.eu4 Time: 15 minutes Deliverable: N4C global diagram (Sysml)

5 Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances Grant Agreement: 223994 Phase 3: Identify the main functions and the inputs and outputs of each module 14 May 2008www.n4c.eu5 Time: 15 minutes Deliverable: “n” Sysml diagrams (one per module), with inputs and outputs

6 Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances Grant Agreement: 223994 Phase 4: Identify the expected time for each module development and the dependences between each other 14 May 2008www.n4c.eu6 Time: 15 minutes Deliverable: Integration workplan

7 Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances Grant Agreement: 223994 Phase 5 (optional): Identify the system requirements 14 May 2008www.n4c.eu7 Time: 45 minutes Deliverable: System requirements Checklist


Download ppt "Technical Kick off meeting Grosuplje September 22-23 2008 Integration Preparation António Cunha – Pedro Nunes Institute Networking."

Similar presentations


Ads by Google