Presentation is loading. Please wait.

Presentation is loading. Please wait.

Established in 1998, Sangick Engineering, as a leading tool maker in Korea, has accumulated technology expertise and precious experience in various industries.

Similar presentations


Presentation on theme: "Established in 1998, Sangick Engineering, as a leading tool maker in Korea, has accumulated technology expertise and precious experience in various industries."— Presentation transcript:

1 Established in 1998, Sangick Engineering, as a leading tool maker in Korea, has accumulated technology expertise and precious experience in various industries over the years. Sangick Engineering is a fully integrated mold manufacturer specializing in automotive interiors and exteriors, motor cycle, and home appliance products. Through continuous improvement of our Quality Management System and stringent internal standards, we ensure highest quality of products and services, contribute added values, and bring competitiveness and success to our customers. Excellence in product quality, on-time delivery, communication and customer satisfaction are our main focus. Our Management Team ensures that the quality system is communicated and implemented at all levels of our organization at all times. Company Introduction

2 History 2013.09. Attained Company R&D Center Certification 2012.09. Certified Approved Exporter (Incheon Customs) 2012.01. Attained GPPC Certification to supply Injection Mold to GM 2011.11. Attained INNO-BIZ Certification 2010.11 Appointed as a R&D Center by KOITA 2009.02. Expanded and moved to new plant 2008.10. Attained ISO 9001/KSA 9001 Certification 2008.03. Appointed as a partner of KITECH, R&D Center for Korea Government 2004.02. Appointed as an enterprise for advanced cluster(Bu Chon Industry Promotion Foundation) 2003.06 Expanded plant and invested in new equipment 2003.03 Registered member of KOTRA 1999.05 Expanded plant and invested in new equipment 1998.02. Established Sangick Engineering Company Overview Factory Site Number of Employees Web-Site E-mail 40 http://www.sangick.co.kr sangick@sangick.co.kr History 16-7BL 768-7, Ojeong - Dong, Ojeong – Gu, Bucheon – City, Guynggi-Do, KoreaHead Office (Korea)

3 Certification of Participation in Cutting Edge Mold Industry Certification of Partnership from Korea Institute of Industrial Technology ISO 9001 Certification Certification Approved Exporter (Incheon Customs) GPPC Certification

4 NOToolCapabilityQuantityMaker 13D CADUNNIGRAPHICs5Siemens 23D CAMPower Shape3DELCAM 33D CAMVISI1VERO SOFTWARE 4CNC Program Power Mill8DELCAM NC BRAIN5NCB Equipment List Design Tools

5 NOEquipmentEquipment NameManufacturing CapabilityQuantity 1 MACHINING CENTER SIRIUS-1250VN X 2,500 Y 1,250 Z 1,000mm 20,000 rpm 1 2 MACHINING SIRIUS-850VN X 2,000 Y 850 Z 750mm 12,000 rpm 1 3 MACHINING SIRIUS-650VN X 1,300 Y 650 Z 600mm 5,000 rpm 1 4 MACHINING CENTER SIRIUS-UL+ X 1,020 Y 600 Z 550mm 20,000 rpm 2 5 MACHINING SIRIUS-UL X 1,020 Y 600 Z 550mm 12,000 rpm 2 Equipment List Manufacturing Tools

6 NOEquipmentEquipment NameManufacturing CapabilityQuantity 6 DIE SPOT’G PRESS X 2,000 Y 1,500 P 200ton1 7 CNC EDMΦ10001 8CNC EDM400X300X300 mm1 9EDM 2,000X850X750 mm1 10EDM 2,000X850X750 mm1 Equipment List Manufacturing Tools

7 NOEquipment NameCapabilityQuantityMaker 11MILLING M/C300X800X4205HWACHEON MACHINERY 12LATHE380X7501HWACHEON MACHINERY 13GRINDING MACHINE3450 RPM1SAM JI ELECTRONIC 14GRINDING MACHINE(AUTO)200X480X3490RPM1WOOSUNG TECH 15GRINDING MACHINE(AUTO)520X250X4501JIN YOUNG 16TOOL GRINDING1710 RPM2YOUNG SIN MACHINERY 17RADIAL DRILLING MACHINE12001SHIN NIPPON 18AIR COMPRESSOR50HP1KYUNG WON 19HOIST(10+5) TON1AJU MACHINERY 20HOIST5 TON1AJU MACHINERY 21HOIST2.8 TON2AJU MACHINERY Equipment List Manufacturing Tools

8 CNC EDM High Speed CNC Milling Assembly Production Line

9 S.NChunk NameYearPart NamePicture of Part 1 CONSOLE Assembly2011Console Body Tray Lower Top Cover Garnish LH/RH Gear Case Cup Holder Trunk ASSY2011LUGUAGE BOX Final Assembly Performance Automotive Components

10 S.NChunk NameYearPart NamePicture of Part 2SEAT Assembly2011Shield Cover 1 st row Back Board 1 st row Mountain Cover Pumping Handle Side Cover Etc. Shield Cover 2 st row Back Board 2 st row Final Assembly Performance Automotive Components

11 S.NChunk NameYearPart NamePicture of Part 3 Grille Radiator2010Grille Radiator 2009Grille Radiator 2009Grille Radiator 2012Grille Radiator Grille Ass’y2012Front Bumper Performance Automotive Components

12 S.NChunk NameYearPart NamePicture of Part 4 Glove Box2010Glove Box 2009Glove Box 2009Glove Box PNL-A2012Main Lower 2014Blow Case Performance Automotive Components

13 S.NChunk NameYearPart NamePicture of Part 5 Glove Box Inner/Outter2009Glove Box Inner,Outter Door Trim2009ARM Rest Pillar2009Locker Panel Instrument Panel2009AUDIO CASE 2013B-PILLAR UPPER Performance Automotive Components

14 S.NChunk NameYearPart NamePicture of Part 6 Pump Housing2010Pump Housing 2009Body Slider Thermostat Housing2012Water Outlet 2013Map Pocket 2013Housing for Mirror Performance Automotive Components

15 S.NChunk NameYearPart NamePicture of Part 7 Room Lamp Ass’y2014Room Lamp Engine Room 2013Engine Cover Inside Handle Ass’y2012~2014Inside Handle (due to the confidential, many other product pictures are not listed) Performance Automotive Components

16 5 4 3 2 1 Mold Assembly Design CAM 20days Total 70 days 6 MACHINE Measurement PolishingAssembly Review part design Parting Line Mold base CAM Programming Machining Simulation Electrode Machining Core/Cavity Machining Dimension Measurement Shape Measurement Polishing Grinding Fitting Assembly Wiring 30days 5days 10days 5days Production Timeline for Glove Box Glove Box


Download ppt "Established in 1998, Sangick Engineering, as a leading tool maker in Korea, has accumulated technology expertise and precious experience in various industries."

Similar presentations


Ads by Google