Presentation is loading. Please wait.

Presentation is loading. Please wait.

Eurisol DS, Task 11 meeting, Helsinki September‘07 Task 11.2: Fragmentation of post accelerated ISOL beams David Pérez Loureiro Universidad de Santiago.

Similar presentations


Presentation on theme: "Eurisol DS, Task 11 meeting, Helsinki September‘07 Task 11.2: Fragmentation of post accelerated ISOL beams David Pérez Loureiro Universidad de Santiago."— Presentation transcript:

1 Eurisol DS, Task 11 meeting, Helsinki September‘07 Task 11.2: Fragmentation of post accelerated ISOL beams David Pérez Loureiro Universidad de Santiago de Compostela, Spain

2 Eurisol DS, Task 11 meeting, Helsinki September‘07 Production of extremely neutron-rich nucleus  Two step scheme; fission + cold fragmentation n,p + 238 U  132 Sn + Be  X  Milestones and expected results: - preparation of an experiment (month 12) - data analysis of the experiment (month 28) delayed (Nov 06) - optimal post-acceleration energy estimation (33 month)

3 Eurisol DS, Task 11 meeting, Helsinki September‘07 Proposed experiment S2-S4: 124-132 Sn + Be  X  A/A ~ 2.4 10 -3  Z/Z ~ 7 10 -3  B  /  ~ 3 10 -4  ToF ~ 150 ps L ~ 36 m S0-S2: 238 U(950 A MeV)+Pb  124-132 Sn  Z/Z ~ 5 10 -3  B  /  ~ 3 10 -4  ToF ~ 150 ps L ~ 18 m  A/A ~ 4.5 10 -3 FRS-GSI

4 Eurisol DS, Task 11 meeting, Helsinki September‘07 Proposed experiment S0-S2: 238 U(950 A MeV)+Pb  124-132 Sn  Z/Z ~ 5 10 -3  B  /  ~ 3 10 -4  ToF ~ 150 ps L ~ 18 m  A/A ~ 4.5 10 -3  Experiment proposal was submitted and approved by the GSI PAC (18 shifts 136 Xe-parasitic and 18 shifts 238U )  Beam time expected scheduled July 2006  delayed until November FRS-GSI

5 Eurisol DS, Task 11 meeting, Helsinki September‘07 Completed work during the first 18 months  Detection setup: plastic scintillator at S1 - two fast photo-multipliers Hamamatsu H2431-50mod delivered to GSI last December - these photo-multipliers were tested in a beam time last April  The experiment proposal was submitted and approved by the GSI PAC (18 shifts 136Xe-parasitic and 18 shifts 238U )  Acquisition system: new readout using the buffer memory of the CAEN converters - the system has been implemented and tested with 2 TDC + 1 ADC - final implementation in the FRS DAQ after summer  Detection setup: tracking detectors at S2 - TPCs will be used. New TPCs tested in a beam time last April  New on-line analysis based on Go4 implemented and tested

6 Eurisol DS, Task 11 meeting, Helsinki September‘07 Planned work for the next months  Implementation and test of the new acquisition at the FRS  Fix last details of the experimental setup - calibration requirements for TPCs - photo-multipliers at S2 - removable target at S2  Detailed planning of the experiment - calculation of the magnetic tunings of the FRS - calibration planning with the 136 Xe beam - definition of working teams  Final schedule of the beam time: constraints

7 Eurisol DS, Task 11 meeting, Helsinki September‘07 Preliminary beam-time schedule at GSI

8 Eurisol DS, Task 11 meeting, Helsinki September‘07 Modifications of initial plans  The beam time will be scheduled 9 months later than expected - all milestones of these subtask will be delayed by 9 months


Download ppt "Eurisol DS, Task 11 meeting, Helsinki September‘07 Task 11.2: Fragmentation of post accelerated ISOL beams David Pérez Loureiro Universidad de Santiago."

Similar presentations


Ads by Google