Presentation is loading. Please wait.

Presentation is loading. Please wait.

ARTEMIS Industry Association Title Presentation - 1 ASP 6 Report by: Sandro Etalle

Similar presentations


Presentation on theme: "ARTEMIS Industry Association Title Presentation - 1 ASP 6 Report by: Sandro Etalle"— Presentation transcript:

1 ARTEMIS Industry Association Title Presentation - 1 ASP 6 Report by: Sandro Etalle s.etalle@tue.nl

2 ARTEMIS Industry Association Title Presentation - 2  Car2car communication’s needs:  Speed (time is very critical)  Security (fast access control) & privacy  Technology Objectives  high speed WLAN 802.11 for V2V and V2I communication In safety critical situations e.g., in traffic flow management situations  Data storage and secure transactions User data privacy Integrity against malicious intrusion Without compromising safety  Market Objectives  On-board units:= gps +gsm + wlan system + …  Realized @ silicon level on an MPW  Interested Parties  NXP, NL + D, Peter Zegers peter.zegers@nxp.com  TU/e, NL Proposal 1: Security in Intelligent Traffic Systems

3 ARTEMIS Industry Association Title Presentation - 3 Requirements V2V –Vehicle to Vehicle V2I – Vehicle to Infrastructure Integrity Security Safety Failsafe Systems  Avoid redundancy  Affordable Security Integrity  Tampering sensors Communications  On-chip encryption  Fast  HW accelerator Fast Trust Zone Setup  V2V & V2I  Authentication  NFC (Driver + Car)  Ipv6 address  Certificate  Fast  Hardware secured User Data Privacy  Storage security  Transmission security  NXP, NL + D, Peter Zegers peter.zegers@nxp.com peter.zegers@nxp.com  TU/e, NL  HAI  Hi iberia rgimenez@hi-iberia.esrgimenez@hi-iberia.es

4 ARTEMIS Industry Association Title Presentation - 4 Proposal 2: Stopping Cyberattacks to SCADA  SCADA remote infrastructure is very vulnerable to cyber-attacks  They are finding out  Standard signature-based detection systems don’t work There are no signatures to start with  Technology Objectives  Intrusion detection methods for remote SCADA Proprietary protocols & Signature-less  Market Objectives  Same, + usable and affordable  Interested Parties  Akhela, IT, Katiuscia Zedda katiuscia.zedda@akhela.it  U Twente + Spin-off  Mondragon University  CIMNE  HAI?

5 ARTEMIS Industry Association Title Presentation - 5 Proposal 3: New generation of SCADA allowing for intelligent monitoring.  Critical infrastructure (think: harbor): vast, thousands of nodes  Mistakes/misuses can and do happen wrong sequence of operations + attacker deliberately issues commands  Technology Objectives  SCADA systems allowing for automatic detection of strange/anomalous configuration  Market Objectives  Same, and affordable  Policy-based  Interested Parties  PLC producer ???  Akhela, Utwente  Mondragon University ( + industrial partners)  CIMNE,  Hi iberia rgimenez@hi-iberia.esrgimenez@hi-iberia.es  Visual-Tools,  HAI?

6 ARTEMIS Industry Association Title Presentation - 6 Thank you, name email address

7 ARTEMIS Industry Association Title Presentation - 7 Next steps  First Indication of  Consortium members  Countries involved  Work packages  Effort needed 

8 ARTEMIS Industry Association Title Presentation - 8 Title of project (Arial bold 24 pts) This slide should immediately trigger the interest of your audience:  Short description of the project (max. 5 bullets)  Overall project objectives  Technology objectives  Market innovation objectives  key (end user) benefits and the societal importance 

9 ARTEMIS Industry Association Title Presentation - 9 Technology & Market Innovation  Overall project objectives  Technology objectives  Market innovation objectives  key (end user) benefits and the societal importance < Tell the innovative character of your project and how it responds to industry trends and how it meets the objectives of ARTEMIS. Indicate how your project will contribute to the European technology position in this area.

10 ARTEMIS Industry Association Title Presentation - 10 Next steps  First Indication of  Consortium members  Countries involved  Work packages  Effort needed 


Download ppt "ARTEMIS Industry Association Title Presentation - 1 ASP 6 Report by: Sandro Etalle"

Similar presentations


Ads by Google