Presentation is loading. Please wait.

Presentation is loading. Please wait.

HIE-ISOLDE Project 3 rd beam line + HELIOS June 16th 2015 (updated on June 18th) Y. Kadi, S. Maridor.

Similar presentations


Presentation on theme: "HIE-ISOLDE Project 3 rd beam line + HELIOS June 16th 2015 (updated on June 18th) Y. Kadi, S. Maridor."— Presentation transcript:

1 HIE-ISOLDE Project 3 rd beam line + HELIOS June 16th 2015 (updated on June 18th) Y. Kadi, S. Maridor

2 Phases 1 & 2 + XT03 HEBT: XT01: Miniball XT02: Movable setup + Tilted Foil setup XT03: could be installed by Apr. 2017 together with CM3 and CM4

3 Cost XT03 3 ItemNumberSparesUnit Cost kCHFTotal kCHF* Infrastructure Machine Magnet MD21110 330 Magnet MQ422 88 Magnet ST3 13 39 Convertor MD0 650 Convertor MQ0150 Convertor ST0120 Long Diagnostic Box4 32 128 Vacuum pump + gauges0 11 0 New vacuum sector012 0 Vacuum chamber MD025 0 Vacuum chamber MQ05 0 Vacuum chambers SSS/triplet0 5 0 Interlocking MD/MQ/ST (incl. cabling)0 20 MD jacks0 4.5 0 Supports type Doublet/Triplet04 0 XYZ stages0 2 0 Cabling MD/MQ/ST magnets + racks0 50 0 Cabling DB + rack050 0 Cabling vacuum0 50 0 Cooling MD/MQ/ST0 2.5 0 Installation and survey (man-months)18 8 Design layout/integration (man-months)08 0 Beam dynamics (man-months)08 0 Control Software (man-months)0 8 0 Total 8585

4 Proposal#1: HELIOS on XT02 => cost optimised solution Beam parameters unchanged HELIOS footprint includes magnetic shielding + access to the rear Layout remains TSR compatible 10 M 7 M Phase 2 with HELIOS on XT02 (2017/2018) 5.0G @ 2 T 0.1G @ 2T

5 compatible with TRIuP@KVI-CAR on XT01 and Miniball in open position 10 M 7 M Phase 2 with HELIOS + TRIuP

6 Cost HELIOS in XT02 6 ItemNumberSparesUnit Cost kCHFTotal kCHF* Infrastructure Machine Magnet MD00110 0 Magnet MQ222 44 Magnet ST1 13 Convertor MD0 650 Convertor MQ21530 Convertor ST112 Long Diagnostic Box1 32 Vacuum pump + gauges1 11 New vacuum sector112 Vacuum chamber MD025 0 Vacuum chamber MQ05 0 Vacuum chambers SSS/triplet1 5 5 Interlocking MD/MQ/ST (incl. cabling)1 22 MD jacks0 4.5 0 Supports type Doublet/Triplet14 4 XYZ stages1 2 2 Cabling MD/MQ/ST magnets + racks1 52.5 Cabling DB + rack152.5 Cabling vacuum1 52.5 Cooling MD/MQ/ST0 2.5 0 Installation and survey (man-months)3508 74 Design layout/integration (man-months)18 8 Beam dynamics (man-months)18 8 Control Software (man-months)1 8 8 Total 149.5130.5

7 Phase 2 with HELIOS on U-Bend Proposal#2: HELIOS on U-Bend Beam parameters unchanged HELIOS footprint includes magnetic shielding + access to the rear => too close to EPC racks Layout remains TSR compatible 10 M

8 Cost HELIOS in U-Bend 8 ItemNumberSparesUnit Cost kCHFTotal kCHF* Infrastructure Machine Magnet MD41110 550 Magnet MQ11122 264 Magnet ST6013 78 Convertor MD2 65130 Convertor MQ715105 Convertor ST51260 Long Diagnostic Box8132 256 Vacuum pump + gauges5 11 55 New vacuum sector312 36 Vacuum chamber MD225 50 Vacuum chamber MQ75 35 Vacuum chambers SSS/triplet4 5 20 Interlocking MD/MQ/ST (incl. cabling)20 240 MD jacks6 4.5 27 Supports type Doublet/Triplet44 16 XYZ stages11 2 22 Cabling MD/MQ/ST magnets + racks14 535 Cabling DB + rack6515 Cabling vacuum6 515 Cooling MD/MQ/ST14 2.5 35 Installation and survey (man-months)38 24 Design layout/integration (man-months)18 8 Beam dynamics (man-months)18 8 Control Software (man-months)2 8 16 Total 4911474

9 Phase 2 with HELIOS on U-Bend + TRIuP Proposal#2: HELIOS on U-Bend Difficult to fit TRIuP@KVI-CAR on XT01 with Miniball in open position and HELIOS in parking position

10 Phase 2 with HELIOS on U-Bend + TRIuP

11 Thank you for your attention


Download ppt "HIE-ISOLDE Project 3 rd beam line + HELIOS June 16th 2015 (updated on June 18th) Y. Kadi, S. Maridor."

Similar presentations


Ads by Google