Presentation is loading. Please wait.

Presentation is loading. Please wait.

Responsibility Equals Accountability Dangerous Goods Logistics T-1510 How to Open & Close Extendable Tray on R-325 This work has been produced by DGL (Aust)

Similar presentations


Presentation on theme: "Responsibility Equals Accountability Dangerous Goods Logistics T-1510 How to Open & Close Extendable Tray on R-325 This work has been produced by DGL (Aust)"— Presentation transcript:

1 Responsibility Equals Accountability Dangerous Goods Logistics T-1510 How to Open & Close Extendable Tray on R-325 This work has been produced by DGL (Aust) Pty Ltd This Learner’s Tool is about the skills and knowledge required for safely opening and closing R-325 extendable tray.

2 DGL (AUST) Pty Ltd Responsibility Equals Accountability Dangerous Goods Logistics Before you get started It is important that you complete all sections in this learning tool as it has been designed so that You can abide by the procedures of our organization. You can apply what you have learnt in this package in your day to day activities This Learning Tool is designed to be relevant only to DGL (Aust) Pty Ltd employees and only applied whilst employed with DGL (Aust) Pty Ltd You may have already acquired knowledge in the area identified in this package as you may have completed some specialized training. Or you may have been working within the industry for some time. Should you identify any improvement opportunities in the information contained in this package or have difficulties completing the package please contact National Training and Compliance Manager DGL (Aust) Pty Ltd PO BOX 1594 EAGLE FARM QLD 4009 Ph 07 3868 1001 Fax 07 3868 1055

3 DGL (AUST) Pty Ltd Responsibility Equals Accountability Dangerous Goods Logistics Spring Load Bolt The Spring Loaded Bolt should always be in the closed position when is not extended and when the desired length of tray is required. Closed Spring Loaded Bolt Open Spring Loaded Bolt The Spring Loaded Bolt should only be in the open position when the tray is being extended

4 DGL (AUST) Pty Ltd Responsibility Equals Accountability Dangerous Goods Logistics 1. Operator to release the Spring Load Bolts from both the left and right side of the tray Purpose – to allow the tray to slide freely Risks involved – potential pinching to the hands and or damage to the equipment Opening the Tray

5 DGL (AUST) Pty Ltd Responsibility Equals Accountability Dangerous Goods Logistics 2. Once the bolts are released the operator is to move to the rear of the tray and locate the bar above the number plate and begin to pull the tray apart Purpose – This is the centre of the tray and the weight is spread evenly Risks involved – operator can sustain a possible strain injury if not done correctly Opening the Tray

6 DGL (AUST) Pty Ltd Responsibility Equals Accountability Dangerous Goods Logistics 3. Operator to pull the tray and use the locating holes as a guide to achieve the correct length. If the operator can not achieve this on their own a second is required for assistance. Purpose – the location of the holes indicates to the operator the length of the tray Risks involved – operator straining and causing injury. Over extending the tray. Opening the Tray

7 DGL (AUST) Pty Ltd Responsibility Equals Accountability Dangerous Goods Logistics Opening the Tray 4. Operator to observe the flexible cable for the lights when open, checking the cable is not to low to the ground Purpose – to eliminate the cable becoming damaged in transit Risks involved – the electricals for the rear of the vehicle becoming disconnected leading to accidents and fines

8 DGL (AUST) Pty Ltd Responsibility Equals Accountability Dangerous Goods Logistics Opening the Tray 5. Once the tray is at the desired length operator is to close the spring loaded bolts into the location holes on the extension. Purpose – by locking the bolt into place it will eliminate the tray over extending and moving during transportation Risks involved – the spring loaded bolt not been locked in place properly and tray over extends in transit and causes damage to property.

9 DGL (AUST) Pty Ltd Responsibility Equals Accountability Dangerous Goods Logistics Closing the Tray 6. Operator to release the spring loaded bolts on either side of the tray to the open position Purpose – so the tray can slide freely Risks involved - potential pinching to the hands and or damage to the equipment

10 DGL (AUST) Pty Ltd Responsibility Equals Accountability Dangerous Goods Logistics Closing the Tray 7. Operator to push the extension from the middle bar located above the number plate, until the extension is completely closed if unable to do alone to request assistance from another operator Purpose – pushing from the middle of the tray will disperse the weight evenly. If requiring assistance the second operator to push from either side Risks involved – Pushing the extension back in could cause a strain in the operator.

11 DGL (AUST) Pty Ltd Responsibility Equals Accountability Dangerous Goods Logistics 8. Once the tray is back to the closed position operator need to close the spring loaded bolts Purpose – by locking the bolt into place it will eliminate the tray extending and moving during transportation Risks involved – the spring loaded bolt not been locked in place properly and tray extends in transit and causes damage to property. Closing the Tray

12 DGL (AUST) Pty Ltd 6/18/2016 12 Test your knowledge Through the following slides you will be asked an number of questions to show that you have understood the content of this learning tool Please record your answer on the training form F-260. You will be required to submit the answers to the DGL HSEQ unit

13 DGL (AUST) Pty Ltd Responsibility Equals Accountability Dangerous Goods Logistics Question 1 When in transit what needs to be closed at all times? a) The extendable Tray b) Spring Loaded Bolt c) The tool box d) nothing needs to be closed

14 DGL (AUST) Pty Ltd Responsibility Equals Accountability Dangerous Goods Logistics Question 2 If an operator is unable to extend the tray they are to wait until they have enough energy to try again? a)false b)true

15 DGL (AUST) Pty Ltd Responsibility Equals Accountability Dangerous Goods Logistics Question 3 What is the appearance of an open Spring loaded bolt? a)c) b) d)

16 DGL (AUST) Pty Ltd Responsibility Equals Accountability Dangerous Goods Logistics Question 4 What risks are involved when closing the tray prior to locking in the spring loaded bolts? a) cracking the ground b) scratching the paint c) crashing the vehicle d) Injury

17 DGL (AUST) Pty Ltd Responsibility Equals Accountability Dangerous Goods Logistics Question 5 What guide does the operator need to use when extending the tray? a) measuring tape b) location holes c) estimations d) luck

18 DGL (AUST) Pty Ltd Responsibility Equals Accountability Dangerous Goods Logistics Question 6 What is the injury to can occur to the operator when opening and closing the spring loaded bolts? a) sprain b) concussion c) pinching d) broken bones


Download ppt "Responsibility Equals Accountability Dangerous Goods Logistics T-1510 How to Open & Close Extendable Tray on R-325 This work has been produced by DGL (Aust)"

Similar presentations


Ads by Google