Presentation is loading. Please wait.

Presentation is loading. Please wait.

NETC Authoring Instructional Materials (AIM) Roadmap February 2015 1 Bruce Bare.

Similar presentations


Presentation on theme: "NETC Authoring Instructional Materials (AIM) Roadmap February 2015 1 Bruce Bare."— Presentation transcript:

1 NETC Authoring Instructional Materials (AIM) Roadmap February 2015 1 Bruce Bare

2 2

3

4 4

5 5 Availability Signals

6 6 AIM and CeTARS – Notional Course of Action

7 COA #1 COA #1: eTRMS as a Stand Alone POR  eTRMS deployed as an “As-Is” Stand-Alone application solution where all data, regardless of its type, is a manual input.  Personnel (P), Equipment (E), and Space (S) data into eTRMS will be accomplished via manual input by Learning Centers and Learning Sites. No automated data exchanges from or to CeTARS or other data sources. COA #2 COA #2: CeTARS Interfaces into eTRMS – Two Systems Maintained  CeTARS as the Authoritative Data Source (ADS) for Personnel (P); Equipment (E); Spaces (S); and the creation of the Execution Schedule (C).  eTRMS as the Execution Scheduler and Resource Manager (eTRMS).  eTRMS will remain as a Stand-alone Program of Record (POR) maintaining independent ATO, hardware and software requirements but receiving P/E/S authoritative data and availability status from CeTARS via to be determined data exchanges. COA #3 COA #3: Full Integration of eTRMS into CeTARS  Full integration of all eTRMS functionality and capabilities into the CeTARS application and database schema.  CeTARS will become the Authoritative Data Source (ADS) for P/E/S/C.  eTRMS will remain as a Stand-alone Program of Record (POR) for all existing users in an “As-Is” state with no new users added until full integration and transfer of functionality to CeTARS has been completed. 7 Courses of Action (COA)

8 8 COA #1

9 9 COA #2

10 10 COA #3

11 Future Workgroups 11  CMS Working Group: Database differences between CPM and CeTARS indicate a deep dive into the requirements of CeTARS and CPM for the Course Master Schedule (CMS).  As the data density of CPM increases, current CMS Web Service from AIM II will need to be revisited for inclusion or revision of data elements from CPM.  As Capacity Modeling requirements are identified for inclusion in the Execution Scheduler, the CMS will need to reflect those capacity requirements as possible scheduling tags.  RRL Working Group: Currently, CNATT uses the RRL as a component of eTEM. When the final COA is selected, the RRL will become, at some point, a major component in the Execution Scheduler and Resource Manager.  An AIM-CeTARS RRL interface will be required in order to provide scheduling components for RRL TE.  The RRL will be matched with the current inventory to produce TE availability status inputs into the selected Execution Scheduler.  AIM-CPM does not currently have the programming capability to designate the final approved RRL as “Approved”: versioning will need to be incorporated through programming of AIM.  Workgroup Team Make-up:  CMS Working Group to capture new CMS process with AIM-CPM and CeTARS and reflect Capacity Modeling.  RRL Working Group to capture new RRL process with AIM-CPM and CeTARS.

12 12 Questions

13 Backup Slides 13

14 14


Download ppt "NETC Authoring Instructional Materials (AIM) Roadmap February 2015 1 Bruce Bare."

Similar presentations


Ads by Google