Pixel Action Matrix C. Newsom July 15, 2008. Overview Critical Parameters Initial Discussion – Top 6 critical failures Discussion - Detailed Documentation.

Similar presentations


Presentation on theme: "Pixel Action Matrix C. Newsom July 15, 2008. Overview Critical Parameters Initial Discussion – Top 6 critical failures Discussion - Detailed Documentation."— Presentation transcript:

1 Pixel Action Matrix C. Newsom July 15, 2008

2 Overview Critical Parameters Initial Discussion – Top 6 critical failures Discussion - Detailed Documentation Hardware Status Software Status Conclusions

3 Critical Parameters Coolant Pressure Dew Point Detector Temperature (Fire, Flood, etc)

4 Top 6 Critical Failures FailuresDetectionResponse 1Global Power Cut Fire Alarm CMS/DSSHV/LV fast ramp down 2Beam Condition Bad BCM/DSSHV/LV fast ramp down 3Coolant Overpressure Chiller Pressure Relay Chiller DSS HV/LV rampdown. Pump shutoff. 4Cooling Supply Line failure, Chiller failure PLC Temperature, Master PLC/DSS HV/LV rampdown, Notify Operations 5Dew Point Alarm N2 Flush failure PLC/DSS Master PLC/DSS HV/LV rampdown Notify Operations 6HV/LV short circuitCAENChannel Trips

5 Discussion - Documentation System Overview http://docdb.fnal.gov/CMS/DocDB/0004/000404 /005/Pixel-DCS-Alarm-Report.pdf Detailed Failure Modes http://docdb.fnal.gov/CMS/DocDB/0004/000404 /005/PixelFailure-v5.xls

6 Hardware Status PLC is installed and is running Siemens hardware has been complete for months. CAEN hardware infrastructure is complete, a few power modules are yet to be installed. Interlock line between Master PLC and Pixel PLC exists. (See Andromachi for test results.)

7 Software Status PLC –The code is running stably. –Cycle time is 50ms. –Initial Alarm values have been in operation for months. PVSS –The FSM is working. –Tuning of system parameters is underway. –Software alarms are being installed. –Tuning of parameters will begin with the installation of the detector. (deadbands, alarms etc)

8 Integration The system is currently running in stand alone mode. This will continue until the detector is inserted and commissioned. When the system has operated stably for a reasonable period we will then integrate with the Strip Tracker DCS (and higher).

9 Conclusions We have come a long way since I arrived in mid January. We are not quite there yet but are ready to install the detector. The system will be safe to operate with a shifter present. (Pixel in a box has been safely running for several months.) It will become more sophisticated with time. We are happy with our current progress. The chiller safety is our biggest concern.