Presentation is loading. Please wait.

Presentation is loading. Please wait.

Project Concept Project Concept Outline Project Concept Outline ► Executive Summary ► Background ► Challenge ► Suggested Solution ► Suggested Solution.

Similar presentations


Presentation on theme: "Project Concept Project Concept Outline Project Concept Outline ► Executive Summary ► Background ► Challenge ► Suggested Solution ► Suggested Solution."— Presentation transcript:

1 Project Concept Project Concept Outline Project Concept Outline ► Executive Summary ► Background ► Challenge ► Suggested Solution ► Suggested Solution

2 Project Concept Business Concept Outline Business Concept Outline ► Aim of the Project ► Key Assumptions and Constraints ► Cost-Benefit Analysis ► Risk Assessment ► Risk Assessment

3 Business Case Ottawa – Water Park Ottawa – Water Park Ottawa is major tourist destination, the region is lacking a key recreational attraction such as full size water park. The aim of the project is to develop a full-size water park facility

4 Business Case Key Assumptions Key Assumptions ► Suitable location ► Source of financing ► Inflation factor ► Build by contractor ► Run by experienced management ► Timing ► Financial calculations

5 Cost-Benefit Analysis Revenue Projections Revenue Projections Using World Waterpark Association databases Estimated Attendance Gate Passes Parking Fees Concessions

6 Cost-Benefit Analysis Cost Analysis Cost Analysis Construction of Water Park Future Additions Annual Operating Cost

7 Cost-Benefit Analysis Evaluation Evaluation Net Present Value method will be adopted to determine the financial viability of the project.

8 Risk Assessment Obtaining Capital Construction delays Overrun construction cost

9 Cost Benefit Analysis Revenue Analysis Attendance Calculation Market Area Population Penetration (%) Estimated Attend 0-8 Km 200,0004080,000 8-16 km 300,0003090,000 16-24km280,0002056,000 24-40 km 320,0001032,000 Tourists500,0001050,000 TOTAL308.000 The estimated attendance is considered to +/- 20%

10 Cost Benefit Analysis Admission Price Price Category Age Attendance (%) Price Full Day – Half Day Infant0-20Free Children3-1225 16.00 - 12.00 Teenagers13-1735 20.00 – 14.00 Adults18-6440 24.00 – 16.00 Senior Citizens Over 65 2 12.00 – 8.00 Average Price $ 18.60 Gate Receipts would be approximately $5,729,000

11 Cost Benefit Analysis Parking Revenue Calculations Approximately $289,000 per year Capacity of Approximately 4500 guests Average Vehicle contains 3.6 passengers Average 70% guests travel by Cars Approximately 1000 vehicles will be used Estimated Revenues: (308,000 x 0.675 / 3.6) x 5 = $ 288,750

12 Cost Benefit Analysis Concession Revenues Consists of food, beverages, merchandise Annual Revenue per person: 308,000 x $ 5.00= $1,540,000 Total Project Annual Revenues Gate Receipts$ 5, 729,000 Parking$ 289,000 Concessions$ 1,540,000 TOTAL$ 7, 558,000

13 Cost Analysis Initial Project Cost Preliminary Planning & Studies$ 200,000 Site Construction$ 8,000,000 Attractions and Equipment $ 2,000,000 Initial marketing, promotions, advertisement$ 300,000 Project Management Fees$ 1,500,000 TOTAL PROJECT COST$ 12,000,000

14 Cost Analysis Annual Operating Cost Land Lease (fixed)$ 50,000 Advertisement and Promotion$ 750,000 Concessions (50% margin) $ 770,000 Salaries (15% of revenue)$ 1,134,000 Repair & Maintenance $ 300,000 Utilities (5% of revenue)$ 378,000 Insurance (fixed)$ 300,000 Administrative Over heads (all fixed)$ 870,000 GRAND TOTAL$ 5,066,000