Presentation is loading. Please wait.

Presentation is loading. Please wait.

NSS2006Shengli Huang1 The Time of Flight Detector Upgrade at PHENIX Shengli Huang PHENIX Collaboration Outlines: 1.Physics motivations 2.Multi-gap Resistive.

Similar presentations


Presentation on theme: "NSS2006Shengli Huang1 The Time of Flight Detector Upgrade at PHENIX Shengli Huang PHENIX Collaboration Outlines: 1.Physics motivations 2.Multi-gap Resistive."— Presentation transcript:

1 NSS2006Shengli Huang1 The Time of Flight Detector Upgrade at PHENIX Shengli Huang PHENIX Collaboration Outlines: 1.Physics motivations 2.Multi-gap Resistive plate chamber 3.The test beam and Run5 testing results 4.The installation for Run7 5.Conclusions

2 NSS2006Shengli Huang2 Physics motivation for the high-pT detector Phys. Rev. Lett 91, 172301 (2003). Large suppression of    while not protons Large baryon/meson ratios, a factor of 3 above standard fragmentation The data clearly indicates that a new mechanism other than universal parton fragmentation is the dominant source of baryons and anti-baryons in the intermediate pT range in heavy ion collisions. Phenix White paper How about the flavor dependence of energy loss in the higher p T region? X.N. Wang, Phys. Rev. C 58, 2321 (1998). PID out to ~ 10 GeV needed !

3 NSS2006Shengli Huang3 Jet correlations with identified mesons and baryons jet partner equally likely for trigger baryons & mesons, expected from purely thermal recombination (nucl-th/0306027) Need partons from jets to explain the data!! To improve this measurement High-pt PID in both arms Full azimuthal coverage for  Phys. Rev. C 71, 051902(R) (2005)

4 NSS2006Shengli Huang4 Track-by-track high p T PID upgrade With 100ps timing resolution 1)TOF will let the Aerogel detector be well calibrated 2)Aerogel together with TOF can extend the PHENIX track-by- track PID capability to 10 GeV/c 3)Two pieces of TOFw will supply full  coverage for jet correlation measurement High p T PID detector: 1.Areogel Cherenkov n=1.011 2.MRPC TOF  ~100ps

5 NSS2006Shengli Huang5 Ionization Process Avalanche Process Signal Induced Process Multi-gap Resistive Plate Chamber MRPC

6 NSS2006Shengli Huang6 MRPC for PHENIX TOFw 6 gaps (230 micron). Gas mixture: R134A (95%), Isobutene (5%) HV:  7.0~7.5 kV Gas gap = 0.23 mm Readout strip thickness = 0.5 mm Total active area width = 11.2 cm Honeycomb width = 12 cm Glass Electrode Mylar PC board Readout pad Honeycomb Standoff Inner glass width = 11.2 cm Outer glass width = 11.5 cm PCB width = 13 cm Outer glass = 1.1 mm Inner glass = 0.55 mm carbon tape = 0.9 mm Mylar thickness = 0.25 mm PCB thickness = 1.5 mm Honeycomb thickness = 9.5 mm Strip width = 2.81 cm Strip interval = 0.3 cm PHENIX-MRPC: Final Version  Good timing resolution  High efficiency  Cheap for mass production

7 NSS2006Shengli Huang7 Prototypes tested at KEK in June 2004 PH1 PH2 PH3 Different pad/strip design, same structure inside PH1: 50.9 x 53.5 cm 2, 32 strips, readout at both ends. PH2: 12.5 x 53.5 cm 2, 8 strips, readout at both ends. PH3: 12.7 x 53.7 cm 2, 48 pads (6x2 cm 2 ), similar to STAR MRPC.

8 NSS2006Shengli Huang8 KEK beam test results Time Resolution Efficiency PH1: worse timing resolution (>150 ps), same efficency as PH2. Problem on uniformity of performance across the chamber. Difficulties in mechanical assembly. PH2: 68ps timing resolution at optimal condition, but 90% efficiency. Solution  increase strip width. PH3: comparable timing resolution with PH2 (best value: 67ps), 98% efficiency. Gas mixture:95%/5% r134a, iC 4 H 10

9 NSS2006Shengli Huang9 Run5 Beam Results for Final Version Test different MRPC prototypes. Test different electronic chains

10 NSS2006Shengli Huang10 Final Design 1024 readout channels 128 MRPCs, 4 strips/each with double ended readout (detailed dimensions on slide 6) 4 gas volumes. Total active area ~ 8 m 2 Pre-amplification of signals at the detector Analog signal recorded in FEM ( to be used for slewing corrections). Digitization in FEM

11 NSS2006Shengli Huang11 TOF West Installation for Run7 Mechanical Installation Complete Gas System, HV, LV -- operational FEM installation and testing - ongoing

12 NSS2006Shengli Huang12 Conclusions/Outlook In the period Jan 2004 – Oct 2005 we have finished the R&D for the new TOF ( help from our colleagues at RICE university is gratefully acknowledged). A complete detector + electronics chain was successfully operated within PHENIX for 3 months in heavy ion beam conditions in 2005. All design goals were met.  ~100ps, efficiency>90% In the summer of 2006, the whole new TOF has been successfully installed The physics produced with the new TOF detector will be expected from the coming 2007 Run


Download ppt "NSS2006Shengli Huang1 The Time of Flight Detector Upgrade at PHENIX Shengli Huang PHENIX Collaboration Outlines: 1.Physics motivations 2.Multi-gap Resistive."

Similar presentations


Ads by Google