State Regional Haze SIP Development Critical Path for Western States.

Similar presentations


Presentation on theme: "State Regional Haze SIP Development Critical Path for Western States."— Presentation transcript:

1 State Regional Haze SIP Development Critical Path for Western States

2 “Simple” Process? Regional Planning Organization (WRAP) –Forums, Committees Multiple States and Tribes Multiple Federal Agencies –FLM’s –EPA Multiple Planning tracks Long Planning horizons

3 Which Planning Path? 40CFR 51.308 –Participate with other States/Tribes in Regional Planning Organization. –Go it alone 40CFR 51.309 –Available to Nine GCVTC Regional Transport States, Tribes within those States

4 Choices, Choices “309” Planning Path –AZ, CA, CO, ID, NV, NM, OR, UT, WY, and Tribes within –Control Strategies already developed through GCVTC Recommendations, Annex –Presumptive “Reasonable Progress” to improve visibility in 16 Colorado Plateau Class I areas (Low Hurdle) –Submittal due by Dec., 2003

5 Choices, Choices (cont.) “308” Planning Path –RPO Initial “Committal” SIP (defer core requirements) Due 1/3 yrs after EPA designates PM 2.5 Attainment/Non-Attainment areas Full SIP, w/core requirements due NLT 2008 –Go it Alone Initial SIP addresses core requirements Due 1/3 yrs after EPA designates PM 2.5 Attainment/Non-Attainment areas

6 WRAP Technical Work To Date Mostly to provide information for 308/309 decisions, support for initial 309 SIPs

7 What you should know by June 30, 2002 for 308/309 decision Steps 1-4 of 12-step SIP process Definition of Natural Conditions Indication of PM 2.5 Attainment/Non-Attainment Status Indication of timing of EPA designations Timing, scope of initial SIP submittals (2003 vs. 2005, or so; 16 Class I areas vs. all other Class I areas) Levels of Demonstration of Reasonable Progress (Annex presumed to be Reasonable Progress)

8 What you should know by June 30, 2000 (continued ) LTS Content in initial SIP (Annex vs. Other control measures) Annex/BMT vs. BART (No. BART sources) Clean Air Corridor Boundaries Projected Visibility Improvement in 16 class I areas, 1996-2018 Point source SO 2 emission reduction 1990-2000 Other –Reasonable Attribution, Critical Mass, etc.

9 What you might not know by June 30, 2000 ( What you don’t know won’t hurt you… ) Definition, Mobile source significance, Level of visibility impact in 16 Class I Areas Definition, Road dust significance, Level of visibility impact in 16 Class I Areas Visibility impacts from increased Rx Burning and Agricultural Burning Other

10 6/2002 1234 5 5a 5b 5c WRAP input Through June 30 A-M Where We are now… WRAP input through Dec. ’02 N-W

11 The next 1 ½ Years… 1/20036/20031/2004 11 Enabling Leg. BSMT, ESMP Etc. 6,8 9c 12 10 6 6 78 Enabling Leg. Long Range Strategies Enabling Leg. Committal SIP LRS? Sched. dep on PM 2.5 des dt, att. status Earliest Anticipated PM 2.5 designations

12 On to 308 SIP’s 9a1011 12(1) 9b1011 12 Start SIP for Other Class I Areas Sched. dep on PM2.5 des dt, att. status 1/2005

13 At last…(at least for awhile) 7 79b10 12 108 118 12(2) 119b 1/2009 6/2008 6/2005 Latest Anticipated PM 2.5 Designations PM, NOx 5 yr rev.

14 “Simple” 1/2014 6/2017 5 Yr. rev Start SIP Revision 1/2019 12