Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE)

Similar presentations


Presentation on theme: "Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE)"— Presentation transcript:

1 Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) S. Redaelli, LMC, 10- 02-2016 Introduction 1 “5 th motor axis” functionality: Moving transversally the whole tank by ±10mm to offer “fresh surface” in case of beam impacts. “5 th ” as it comes in addition to the 4 jaw motors. Available for all collimator orientations (H, V, S). IR3/IR7: primary and secondary collimators equipped with 5 th motor for remote control. Other collimators: manual movement. Run I operational experience emphasized the important role of tertiary collimator robustness for the β* at the LHC.

2 Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) S. Redaelli, LMC, 10- 02-2016 Non-conformity 2 V. Baglin, Chamonix 2014 See also: Y. Muttoni at the ColUMM meeting of 21/08/2014 (PDF)(PDF)

3 Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) S. Redaelli, LMC, 10- 02-2016 Proposed solution 3 Integration worked out a solution that allows - to recover the 5 th axis functionality for TCTPH/TCL; (horizontal plane most relevant for asynch dump) - to partially recover it for the TCTPV (half stroke); (could not fully solve the conflicts with other beam pipe) - to sectorize the TAN-D2 regions around IR1. Compatible with presently schedules 2015 beam stop. We also propose to add motors for the remote control. Detailed scope of proposed layout change: - reducing outgoing beam pipe diameter; - adding longer bellows that absorb transverse stoke of collimator tank; - adding sectorization valves (like is the case already for IR5); - applying small longitudinal shifts of components, manufacturing of new transition pieces.

4 Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) S. Redaelli, LMC, 10- 02-2016 Example 4 ↓ New proposal ← Present layout

5 Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) 5 th axis installation: SUMMARY Installation for the 5 th axis aimed to recover collimator functionality (transverse jaw movement to recover fresh surface – required when pushing beta*) {ECR LHC-TC-EC-0004 - EDMS1522993} TE-VSC profited to install valves for sectorisation Known to be critical (demanding alignment and tight space). – Enough space between all the components in the integration study by using the theoretical 3D models. Tolerances 1-2mm min. – In 3 out of 4 locations some contact between the cooling tube of the VERTICAL collimator and the parallel chambers or some misalignment due to loss of fiducialisation of modules necessitated additional work from the vacuum side – Aperture been checked after SURVEY measurements are completed 5 th axis movement – Commissioned OK for all HORIZONTAL TCT collimators – Half movement (inwards) for vertical TCT collimators due to contact or proximity of parallel beam chamber – OK for all TCL that have been commissioned, one problem at 4L1 due to a QRL protection left in place.

6 Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Example : 4L5 installation status Alignment of VAM lengthy but successful. Vacuum chambers connected without interference or contact. TCTPH 5 th axis movement OK. To be baked-out Generally worked, TCTPV and TCL movement to be tested

7 Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Counter-example: from TE-VSC in 4R1

8 Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) PLAN of ACTION SU measurements of all 4 points (4L5 and 4R5 missing) Check visually where/if points of contact (reported only TCTPV in 4R1 and 4L1) Check aperture acceptable Intervene if/where possible to move back the VAM modules that had to be moved by vacuum group, measuring final position (possible after bake-out completed and baking equipment removed, should be in 2.5wk) Report status to LMC (in 3wks time or after end of YETS)

9 Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Cryo protection ENTM - 25.09.2012Collimator Exchange Procedure 9 During the installation of the cryo- protection a conflict occurred (slot TCL.4L1.B2) between a screw head of the cryo shield and the back of the collimator support. A modification of the cryo shield and the collimator cable support was necessary to allow the installation and the alignment. For the installation in LS1, in March 2014, the decision was taken not to install these protections (Integration was then not done at the time)

10 Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Cryo protection ENTM - 25.09.2012Collimator Exchange Procedure 10 Pressurised line and QRL protection is in place for IR 3 and 7 In many locations of IP 1, 2, 5 and 8 a protection is in place too. Impossible to install in some locations with collimator in place Accessibility of switches and motorisation strongly reduced Future manutention of the collimator in 4L1 has to be re- addressed (see email) Alternative safety procedure and equipment to be developed

11 Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Further details

12 Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Aperture and alignment VAM vacuum modules requested to be aligned better than to 1mm to recover margin on aperture D2 TCTPH TCTPV TAN TCL(H) VAMT VAMCE 66mm ID VCRLS = 14sigma (n1 as for LHC DR) without offset 63mm ID VVGST= 12sigma (n1 as for LHC DR) without offset 82/87 offset 52mm ID TAN = ~10.1-10.5 sigma (n1 as for LHC DR)

13 Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Distance from average beam : chambers alignment/circulating beam VAM requested to be aligned better than to 1mm to recover margin on aperture Alignment data closer to circulating beam to recover further margins on aperture New positions checked on drawings D2 TCTPH TCTPV TAN TCL(H) VAMT VAMCE 87/87.3 89/88.99 86.76 85.82/84.82 85.4/84.4 86/82.6 87/82 The minimum space between the TCTV {most protruding object from the tank} and the parallel chamber reduces from 10mm to 8.8mm (with consequent reduction of the 5th axis movement by the same amount in the outer direction) The minimum space between the TCTH {} and the parallel chamber reduces from 4.6mm to 3.4mm (should not affect the 5th axis movement) The minimum space between the TCL {} and the parallel chamber is invariant and stays at 6.6 mm (neither the TCL nor the parallel chamber are affected by the new alignment scheme).

14 Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) 4L5 installation status Alignment of VAM lengthy but successful. Vacuum chambers connected without interference or contact. TCTPH 5 th axis movement OK. To be baked-out Generally worked, TCTPV and TCL movement to be tested

15 Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Report from TE-VSC in 4R1

16 Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) 4R1 ( ) DB vacuum chamber centering/circulating beam SU measurements/circulating beam 85.9/ 82.73 87/82 88/ 84.33 After TE/VSC intervention to close chambers + best vacuum alignment TCTPH 5 th axis movement OK, TCTPV limited to half inwards 86/ 86.57 87.5/ 84.94 85.82/84.82 86.76 85.4/84.4 87/87.3

17 Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) 4L1

18 Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) 4L1 ( ) DB vacuum chamber centering/circulating beam - SU measurements 87/82 86.6/ 84.32 After TE/VSC intervention to close chambers + best vacuum alignment TCTPH 5 th axis movement commissioned OK, TCTPV limited to half inwards 85.9/ 84.98 87/87.3 86.76 85.4/ 86.55 86.8/ 82.71 86/82.6 85.82/84.82 85.4/84.4

19 Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) 4R5 installation status Similar interference as in 4R1. Vacuum chambers connected without interference or contact. TCTPH 5 th axis movement OK. TCTPV limited to half inwards.

20 Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) TCL4 leaning on QRL protection in 4L1