Presentation is loading. Please wait.

Presentation is loading. Please wait.

GYSEV & BIKERS Németh Béla Project manager. Presentation Contents About GYSEV Projects Developments.

Similar presentations


Presentation on theme: "GYSEV & BIKERS Németh Béla Project manager. Presentation Contents About GYSEV Projects Developments."— Presentation transcript:

1 GYSEV & BIKERS Németh Béla Project manager

2 Presentation Contents About GYSEV Projects Developments

3 Who we are 1872 Baron Victor von Erlanger won concession contract to construct a rail line between Győr-Sopron- Neufeld/Leitha 1876 Starting year of rail operation 1921 At the end of the 1st World War, part of the lines became Austrian territory (border- redrawing) 1923 Hungarian-Austrian state contract allowed the operation with Hungarian State’s major ownership

4 Geographical position Who we are Strategic position In the middle of East – West and North - South

5 6. C o r r i d o r ( R F C 6 ) 7. C o r r i d o r ( R F C 7 ) 5. C o r r i d o r ( R F C 5 ) Geographical position Who we are Rail Freight Corridors according to EC Regulation 913/2010

6 HungaryAustriaStrabag SE 65.6 %28.2 % 6.1 % GYSEV Cargo Zrt GYSEV Zrt 100 % Raaberbahn Cargo GmbH Who we are Company ownership structure

7 Network and service area GYSEV rail network from 2011 -Győr-Sopron-Ebenfurth -Fertőszentmiklós-Neusiedl -Sopron-Szombathely -Szombathely-Körmend- Szentgotthárd -Porpác-Csorna-Rajka -Szombathely Zalaszentiván -Körmend-Zalalövő -Szombathely-Kőszeg 2012 data: Freight transport: 5 M tons Logistics: 270.000 tons moved Staff: 2,000 employees (HU) 150 employees (AT) Public transport: 3.39 M passengers (HU) 1.39 M passengers (AT) Number of trains operated: Passenger: 121,000 trains Freight: 21,000 trains Own lines: 116 km Lines operated by GYSEV: 387 km

8 Who we would like to be GYSEV is the leading public service provider of the area Rail as alternative to freight transport by road along the transit corridors GYSEV in the future

9 Proper infrastructure Modern interlocking system, catenary, telecom- munication Good vehicle fleet (locomotives and coaches) Service develop- ments Successful tenders No track speed restrictions, m aintained stations Traffic safety develop- ments What is needed for success?

10 GreMo Pannonia (2008-2012) The project with Burgenland as LP is financed as part of the program „creating the future” by the European Territorial Co-operation (ETC). Within the frameworks of the cross-border mobility project for the region Burgenland – West-Hungary „GreMo-Pannonia“, several projects are implemented around the topics cycling public transport, passenger information and cross-border co-operation l Project partner: GYSEV (Raaberbahn) as Hungarian partner Verkehrsverbund Ostregion GmbH (VOR) ÖBB Postbus GmbH along with ÖBB Personenverkehrs AG

11 GreMo Pannonia Documents in connection with cycling Cross-border cycling concept Cross-border cycling masterplan Next Bike – Sopron Feasibility study

12 Quality control Main objective: improve the quality of cross-border cycling paths, to this end the common formulation of criteria Main quality criteria direct links, tracing, quality of road, traffic safety, traffic signs, Additional criteria multilingual information panels, rest areas, connection to community transport etc. Collection of positive and negative experiences through on-site inspections from experts, formulation of proposals

13 Next Bike around Sopron Town of Sopron: 66 bike rentals In Hungary: 30 bike rentals around Sopron In Austria:30 bike rentals

14 Next Bike rentals in Sopron

15 Cycling concept Cross-border cycling concept in the region of Burgenland – West-Hungary Analysis of the present cross-border bicycle transport in Burgenland and West- Hungary, Case study, Problem-analysis, Measures to foster cycling, Essential, specific measures

16 Fertő-Hanság mobile The project >>Environmental- friendly mobility in the Fertő- Hanság region >Fertő- Hanság mobile<< is a cross-border project of Austria and Hungary within the programme of European Territorial Co-operation (ETC) Working Packages: 1) Modernisation of the infrastructure of the Neusiedler Seebahn (NSB) 2) Bike path development in the Hungarian region "Hanság" 3) Ecomobility Seewinkel

17 Fertő-Hanság mobile Within the EU project “Fertö-Hanság mobile“, the bike-route “B22-Hanság Cylcling route” has been extended. Now B22 leads from the historically sig- nificant bridge of Andau along the “Hanság-canal” westwards, up to the newly established “Baron Berg Gusztáv- Bridge”.

18 Fertő-Hanság mobile All services of passenger transport are provided by GYSEV as railway undertaking responsible for operating the route. Neusiedler Seebahn GmbH was founded more than 115 years ago. The province of Burgenland as majority shareholder (50.1 %) and the Republic of Austria (49.9 %) have shareholdings in Neusiedler Seebahn GmbH. Next Bike rentals at the railway stations

19 NSB timetable

20 SiEBaBWe project The project >> Safety inspections in the hungarian austrian border area short>>SieBaBWe<< is a cross-border project of Austria and Hungary within the programme of European Territorial Co-operation (ETC) Locale investigation with experten Interview with inhabitants Recommendations for railways company and for authority Awareness for the inhabitants

21 Discounts for bikers Bike tour ticket: HUF 420,- Discounted daily rates for bicycles on trains to Lake Balaton and Lake Fertő throughout the year Hungarian Bicycle Club Card Owners of the Hungarian Bicycle Club Card may transport their bikes within Hungary with a 25% discount. Einfach Raus – Bike ticket: Austrian day ticket together with bike transport 39 € / 2–5 people discount travel options in Austria with ÖBB on the trains R-, REX and S-Bahn. Bicycle day ticket to Austria: 5 € From 15th June to 25th August, trains running daily to Lake Balaton : Szombathely – Keszthely – Fonyód – Kaposvár Szombathely – Tapolca – Balatonfüred – Székesfehérvár – Budapest Déli

22 B+R locations B+R Station/stop B+R capacity Szombathely- Kőszeg 126 Sopron-Győr182 Rajka-Porpác106 Sopron- Szombathely 268 Szombathely- Zalaszentiván 60 742 B+R Implemented from own resources

23 B + R locations B+R Station/stop B+R capacity Szombathely198 Ják-Balogunyom30 Egyházasrádóc74 Körmend180 Horvátnádalja40 Csákánydoroszló80 Rátót60 Alsórönök30 Szentgotthárd100 792 Implementation from EU- resources : Szombathely - Körmend line

24 B+R bicycle storage place Szombathely

25 B+R bicycle storage place Szombathely

26 Kapuvár B+R bicycle storage place Sopronkövesd

27 Vehicles suitable for bike carriage 9 Jenbacher-type diesel railcars 6 Twin-Jenbacher diesel railcars 10 GYSEV-FLIRT electronic railcars, the first will start in December 2013 17 regional passenger coaches

28 1 station, 3 railway undertakings- Győr- Sopron-Ebenfurti Vasút - GYSEV Railway carriage for bike transport

29 1 station, 3 railway undertakings– Austrian Federal Railways- ÖBB

30 Railway carriage for bike transport 1 station, 3 railway undertakings– Hungarian State Railways - MÁV

31 Infrastructure developments: electrification and paralellisation Electrification: Porpác-Mosonszolnok, Szombathely-Zalaszentiván 87+50 km line; budget: 71 million € Grant contract: July 2012. Realisation: till October 2015. Paralellisation: Győr-Sopron-border line Capacity increase, track upgrade (160 km/h, 225 kN) Now: preparation, Realisation - planned: 2016-19 Ongoing and planned developments

32 Szombathely rail hub modernisation Szombathely station and shunting yard, including railcar repair hall 6 rail lines meet here Increasing capacity New electronic interlocking system Increasing axle load to 225 KN Creating 55 cm high platforms Upgrading passenger information system ETCS Level 2 deployment Szombathely Planned developments

33 Thank you for your attention! Béla Németh


Download ppt "GYSEV & BIKERS Németh Béla Project manager. Presentation Contents About GYSEV Projects Developments."

Similar presentations


Ads by Google