Presentation is loading. Please wait.

Presentation is loading. Please wait.

Edexcel BTEC Level 2 Diploma in Construction Risk Assessment Unit 2 Exploring Health and Safety.

Similar presentations


Presentation on theme: "Edexcel BTEC Level 2 Diploma in Construction Risk Assessment Unit 2 Exploring Health and Safety."— Presentation transcript:

1 Edexcel BTEC Level 2 Diploma in Construction Risk Assessment Unit 2 Exploring Health and Safety

2 Edexcel BTEC Level 2 Diploma in Construction Aims Learning Outcome 2 Be able to carry out risk assessments http://www.edexcel.com/migrationdocume nts/BTEC%20Firsts%20from%202010/BF 021800-Firsts-Construction-Issue3.pdfhttp://www.edexcel.com/migrationdocume nts/BTEC%20Firsts%20from%202010/BF 021800-Firsts-Construction-Issue3.pdf

3 Edexcel BTEC Level 2 Diploma in Construction Objectives To produce a risk assessment (P4) To explain what a control measure is (P5) To identify a control measure which will reduce a hazard to an acceptable level.(M2)

4 Edexcel BTEC Level 2 Diploma in Construction Flat roof above the Learning Zone windows Scenario The flat roof above the windows to the learning zone requires re-roofing

5 Recap Define the term Hazard Define the term Risk Edexcel BTEC Level 2 Diploma in Construction

6 Five steps to risk assessment Step 1 Identify the hazards Step 2 Decide who might be harmed and how Step 3 Evaluate the risks and decide on precautions Step 4 Record your findings and implement them Step 5 Review your assessment and update if necessary

7 Risk rating of Hazards The identification of hazards relies on training, knowledge and experience of construction. Hazards have to be classified so you can understand which are the most important. To accomplish this, they can be classified high medium low Part of the risk assessment process asks you to assess the potential harm from the hazard. Risks can be rated by the likelihood that the hazard will cause harm and the severity of that harm were it to occur. The mathematical formula to do this is: Risk = Likelihood x Severity

8 Risk Matrix likelihood severity 1234 1 2 3 4 high medium low

9 Assignment Task 5 (P4) using the template below produce a risk assessment for the roof works to the flat roof at Coleg Cambria for each of the following items: Plant, Equipment, Machinery, Materials (P4) Explain how control measures are used in risk assessment procedures. (P5) then relate the findings of the risk assessment to the recommended control measures. (M2) Edexcel BTEC Level 2 Diploma in Construction

10 Student Activity Provide two examples of: Plant Equipment Machinery Materials That will be used on this project Edexcel BTEC Level 2 Diploma in Construction

11 Item Exact Type Hazard Risk Control Measure Plant Equipment Machinery Materials

12 Changes in Work The estate manager has decided to replace the flat roof with a pitched roof. Examine the section drawing and evaluate how this change will effect the work.(D1) Edexcel BTEC Level 2 Diploma in Construction

13 Drawing Edexcel BTEC Level 2 Diploma in Construction


Download ppt "Edexcel BTEC Level 2 Diploma in Construction Risk Assessment Unit 2 Exploring Health and Safety."

Similar presentations


Ads by Google