Current activities and short term plans 24/04/2015 P. Hristov.

Similar presentations


Presentation on theme: "Current activities and short term plans 24/04/2015 P. Hristov."— Presentation transcript:

1 Current activities and short term plans 24/04/2015 P. Hristov

2 Recent events: CHEP’15 “CWG13” presentations – Mohammad: ALFA: The new ALICE-FAIR software frameworkALFA: The new ALICE-FAIR software framework – Matthias:A design study for the upgraded ALICE O2 computing facilityA design study for the upgraded ALICE O2 computing facility – Alexey: Efficient time frame building for online data reconstruction in ALICE experimentEfficient time frame building for online data reconstruction in ALICE experiment – Aram (best poster in track 8 + lightning talk): Optimizing the transport layer of the ALFA framework for the Intel Xeon Phi co-processorOptimizing the transport layer of the ALFA framework for the Intel Xeon Phi co-processor

3 Recent event: CHEP’15 HLT talks – Mikolaj: The ALICE High Level Trigger, status and plansThe ALICE High Level Trigger, status and plans – David: Fast TPC online tracking on GPUs and asynchronous data-processing in the ALICE HLT to enable online calibrationFast TPC online tracking on GPUs and asynchronous data-processing in the ALICE HLT to enable online calibration General talks – Thorsten: Computing at FAIRComputing at FAIR

4 Recent events: CHEP’15 Other talks – Graeme Stewart: Evolution of Computing and Software at LHC: from Run 2 to HL-LHCEvolution of Computing and Software at LHC: from Run 2 to HL-LHC – Niko Neufeld: Future of DAQ Frameworks and Approaches, and Their Evolution toward ‘Internet of Things’Future of DAQ Frameworks and Approaches, and Their Evolution toward ‘Internet of Things’

5 Recent events: O2 TDR submitted on 20/04/2015 Dear all, The TDR has been submitted yesterday to the LHCC. Congratulations to all for your hard work leading to the timely submission of this important document ! You can find here the document submitted: https://alice- o2.web.cern.ch/content/documents/tdrhttps://alice- o2.web.cern.ch/content/documents/tdr We will still wait a few weeks for the first feedback from the LHCC before printing it. This is why there is also a version with the line numbers so that we could keep track of typos and mistakes that might still be present in this version Best regards, Mikolaj, Predrag and Pierre

6 Short term plans TDR: answer the questions “Infrastructure” – DDS (Anar, Andrei) Possibility to implement full TPC reconstruction chain Next DDS working session in June/July (see Doodle poll)see Doodle poll – ALFA (Mohammad) – Logging facility (Sylvain) – Documentation, Twiki, JIRA, Indico minutes (Peter)

7 Short term plans Data transfer – Integration of Zookeeper service (Alexey?) Reconstruction – “Realistic” emulated time frames in HLT format (Matthias) – Infrastructure for time frame building (Nicolas?) – New raw data format (Peter?) – Native reconstruction device using Hough transform (Charis) – Additional tests after the update of DDS (Matthias)

8 Short term plans Reconstruction – ITS reconstruction (Maximiliano?) – Native (no HLT wrapper) CA reconstruction device (?) Simulation – ITS digitization (Markus?) – TPC simulation (Jens?) – Simulation of time frames using the general infrastructure (?)

9 Short term plans Calibration – Example of calibration device on FLP (?) – Example of calibration device on EPN (?) – New OCDB design (?)