PROJECT STATUS REPORT C-E CONSTRUCTION CORPORATION CONTRACTORS: S & H Electrical Construction Corporation CDC REALTY, INC.

Similar presentations


Presentation on theme: "PROJECT STATUS REPORT C-E CONSTRUCTION CORPORATION CONTRACTORS: S & H Electrical Construction Corporation CDC REALTY, INC."— Presentation transcript:

1 PROJECT STATUS REPORT C-E CONSTRUCTION CORPORATION CONTRACTORS: S & H Electrical Construction Corporation CDC REALTY, INC.

2 Lion’s Park RESIDENCES: 2  Lion’s Park residences is a 1.9 ha. development of CDC Realty, Inc., @ the heart of Parañaque City.  It was design by GGG Architects headed by Arch.Manuel Go, Jr., with Landscape design by ADI.  It composes of eleven (11) buildings, 5 to 6 storey’s in height, mostly residential consists of 1 & 2 Bdrm units.  Amenities such as Swimming Pool, Multi-Purpose Building, Parking buildings, Guardhouse & Gates w/ 24 hours security, Underground Meralco & PLDT facilities, etc.

3 Construction issues/Concerns/Action taken 3 For Butterfly & Camel: Installation of Genset @ Butterfly building and hook up of camel building to Antelope building. For Bison & Codfish: Hook up of genset @ Butterfly Building. For Dolphin: CECON’s accomplishment: Projected-44.29%Concreting Topping-Off was conducted last Thursday, July 02, 2009. Actual-53.36%CHB laying @ 2 nd to 4 th floor were substantially completed, Variance- 9.07% while 5 th & 6 th are on-going. No. of days ahead- 28 daysSlab on-fill preparation are still on-going, for FDT by next week. Time Elapsed-118 daysPending permit application due to Barangay clearance For Site Development works: Central Park & Landscape – substantially completed except for steel grating fabrication w/c are still on-going. Barbeque Pits – completed. Butterfly garden – for Net installation Trellis – for retouching works Bridge over Koi pond – completed Step pad & Landing Pad near Koi Pond – completed Temporary Parking @ Elephant Building – completed

4 Dolphin Building: 4 PREVIOUSTO DATE

5 Dolphin highlights: 5 4 th & 5 th Floor CHB Laying Precast Installation

6 Swimming Pool Accomplishment: 6 SWIMMING POOL RAILING INSTALLATION CONSTRUCTION OF ADDITIONAL TRELLIS @ LEFT SIDE OF PAVILION ENTRANCE GATE TO POOL

7 Pavilion Accomplishments: 7 STAIRS GOING UP GROUND FLOOR OVERVIEW OF PAVILION & CENTRAL PARK 2 ND FLOOR

8 Central Parks’ Accomplishment: 8 BENCHES @ CENTRAL PARK WATER FEATURES (BUBBLERS) CHILDREN’S PLAYGROUND KOI POND AREA BARBEQUE PITS BUTTERFLY CAGE/GARDEN

9 Summary of Bldg.Accomplishment 9 BUTTERFLY BLDG.CAMEL BLDG. BISON BLDG. CODFISH BLDG. ANTELOPE BLDG.