Khuzestan Regional Electric Company 1. 2 Operational areas of Khuzestan Regional Electric Company Estimated population in : Khuzestan: 5025550 people.

Similar presentations


Presentation on theme: "Khuzestan Regional Electric Company 1. 2 Operational areas of Khuzestan Regional Electric Company Estimated population in : Khuzestan: 5025550 people."— Presentation transcript:

1 Khuzestan Regional Electric Company 1

2 2

3 Operational areas of Khuzestan Regional Electric Company Estimated population in : Khuzestan: 5025550 people Kohgiluyeh Boyer: 765,550 people Total: 5791100 people Area of operation: 80,482 square kilometers 3

4 H S H H 400 KV 132 KV 230 KV 7399MW 2395MVA 2268MW520MW 4800MVA 175MW 4355MVA G 621MW 33KV 3114MVA 11KV 230MVA 400 KV over head lines: 1969 k.m 8183MVA 2132MVA 132KV over head lines: 4176 k.m 230KV over head lines: 2360 k.m G 972 MW Nominal Capacity Of Installed Power Plant Diagram Of Installed Capacity (Product & Transition) KVMW 4008371 2303603 132175 SUM12149 4

5 MW Description Description 1850RAMINGovernmental Thermal Power Plant 815ABADAN Private 418ZERGAN. 972KHORAMSHAHR. 4055Sum 2000ABASPOUR.DAM Governmental Hydro Electric Power Plant 520DEZ.DAM 399KARKHEH.DAM 2000MASGED SOLAIMAN.DAM 75MAROON.DAM 2000KAROON3.DAM 100MOLASADRA.DAM 1000Gotvand.DAM 8094Sum 12149Total 7521Peak Load 13509657 (Mwh)Consumption of electricity Energy (March – July 2015) Installed Power Plant (MW) 5

6  Power Plants  Wind Energy  Solar Energy  Recycling CO2  Finance 6 Large scale >25MW Small scale <25MW Appendix

7 First section Large Power plant 7

8 8 Capacity Investment In Power Plants (Large Scale) Capacity (Mw) CityRow 500 Rahmormoz1 500 south ahvaz2 500 Arvand3 500 Andimeshk4 500 Masjed Soleyman 5 2500 TOTAL

9 9

10 10 Capacity Investment In Power Plants (Small Scale) Capacity (Mw) Place(substation)Raw 25 south Ahvaz 1 25 North Ahvaz 2 25 Molasani 3 25 Tavana 4 25 Main Abadan 5 25 Main Shoshtar 6 25 Omidieh 1 7 25 40 Mail 8 25 Hendijan 9 25 Mohamad abad 10 25 Ezeh 11 25 Haftape 12 25 Zibashahr 13 25 FatholMOBIN 14 350TOTAL

11 Free Transfer of Land in industrial Estates1 Transfer of Land to rent long Term in Place of Electricity Posts2 If efficiency of more than 50% then paid a Quarter of the Price of Fuel3 Down Payment Electricity Purchases by the Electrical Companies4 Instruction 11

12 Renewable Energy Power Plant Renewable Energy Power Plant 12

13 The process of investment in construction of non- governmental renewable power plants In parallel with fulfillment of principle 44 of the Constitutional Law concerning improvement and development of partnership of private sector in the national economic activities and for the purpose of protecting fossil energy sources and environment, assisting in diversification of energy sources aiming at sustainable development and passive defense and also in parallel with encouraging the private sector to invest and participate in the generation of electricity from renewable and clean sources, Ministry of Energy has put among its policies the guaranteed purchase of electricity generated by these power plants. ln this regard, based on approval No.94/23773/60/100 dated July 21, 2015 of the respected minister of energy, the electricity generated by those power plants is purchased as follows. 13

14 RowTechnology type Guaranteed electricity purchase tariff (IRRs per kWh) 1 Biomass-landfill2900 Biomass- The anaerobic digestion3150 Biomass- incineration5870 2 Wind farm above 50 megawatt capacity4060 Wind farm with the capacity of 50 megawatt and less4970 Wind with the capacity of 1 megawatt and less (allocated to the subscribers and limited to the distribution capacity) 5930 3 Solar farm above 10 megawatt capacity5600 Solar farm with the capacity of 10 megawatt and less6750 Solar with the capacity of 100 kilowatt and less(allocated to the subscribers and limited to the distribution capacity) 8730 Solar with the capacity of 20 kilowatt and less(allocated to the subscribers and limited to the distribution capacity) 9770 4Geothermal (including excavation and equipment)5770 5Turbo expanders1800 6Waste Recycling in industrial processes3050 7Small hydropower with the capacity of 10 MW and less3700 8Other types of renewable and clean power plants except hydropower4873 On the implementation of the legal obligations of Ministry of Energy, the guaranteed electricity purchase tariff for types of renewable and clean energy are notified as follows: 14

15 The executive process of investment in construction of renewable energy power plants 15

16 Applicants for constructing nongovernmental renewable power plants shall send to this organization the respective worksheets together with a written application plus the required documentations including statute, official gazette, notice of registered changes of company and specifications of the site so that a construction license for a specified capacity in a definite location is issued. After obtaining other required licenses such as the license for environment, network connection and land possession, a contract for purchasing long term electricity will be exchanged with the applicant so that the applicant commences executive operations for the period of power plant construction. ln the garbage-based biomass power plants and small hydro power plants, permits for the use of garbage-based biomass power plants and water transmission lines and flows are required, respectively. It should b noted that Ministry of Energy and the Renewable Energy Organization of Iran are not able to grant any facilities and concessions to execute the projects of private sector and it will pay for the cost of generated electricity only after the completion of power plant in accordance with the guaranteed purchase contract. 16

17 17

18 RowTechnology type Guaranteed electricity purchase tariff (IRRs per kWh) 1 Wind farm above 50 megawatt capacity4060 Wind farm with the capacity of 50 megawatt and less4970 Wind with the capacity of 1 megawatt and less (allocated to the subscribers and limited to the distribution capacity) 5930 On the implementation of the legal obligations of Ministry of Energy, the guaranteed electricity purchase tariff for types of renewable and clean energy are notified as follows: 18

19 Wind Energy: Based on the studies on the potential of different renewable energy sources, the technical potential of wind energy has been estimated more than 140000MW of which more than 20000 MW is estimated economically. 19

20 The Capacity for Installing Turbine in coastal Regions and vast Plains in West and South of Province Khuzestan Iraq Kuwait Iran Persian Gulf 20

21 21

22 Data Acquisition in Abadan and Mahshahr Sites1 Measuring Altitudes of Wind Speed Heights of 10, 30 and 50 meters 2 Different Types of Anemometer made by Thies3 Studies on Wind direction Heights of 30 and 48.5 meters 4 International Consultant German company Lahmeyer5 Domestic Consultant Iranian Company Moshanir6 22

23 وضعیت انرژی باد در استان خوزستان : براساس مطالعات انجام شده و نصب دکل و تجهیزات لازم و برداشت اطلاعات باد از قبیل سرعت ، جهت و دما در ارتفاعات 10 ، 30 و 40 متر در شهرهای : آبادان خرمشهر اروند کنار ماهشهر هندیجان شوشتر ایذه نشان از وجود پتانسیل بالای احداث نیروگاه بادی در استان خوزستان دارد. که در این راستا مناطق جنوبی استان در سواحل دریا از سرعت باد نسبتا مطلوبتری برخوردارمی باشند. متوسط سرعت باد در استان خوزستان در مناطق مطالعه شده آبادان و ماهشهر حدود 7 متربرثانیه می باشد و بر اساس مطالعات انجام شده نصب توربینهای بادی با قدرت 1. 5 مگاوات و 2 مگاوات کاملاٌ اقتصادی و مقرون به صرفه می باشد. 23 Wind Points

24 The optimal Capacity of Wind Energy at an average Speed of 7.33 meters per Second in Abadan 24

25 The optimal Capacity of Wind Energy at an average Speed of 7.35 meters per Second in Mahshahr 25

26 The Capacity of economic Turbines 1.5 and 2 MW 26

27 Economic Capacity for Installing 1.5 and 2 MW Turbines 27

28 28

29 RowTechnology type Guaranteed electricity purchase tariff (IRRs per kWh) 3 Solar farm above 10 megawatt capacity5600 Solar farm with the capacity of 10 megawatt and less6750 Solar with the capacity of 100 kilowatt and less(allocated to the subscribers and limited to the distribution capacity) 8730 Solar with the capacity of 20 kilowatt and less(allocated to the subscribers and limited to the distribution capacity) 9770 On the implementation of the legal obligations of Ministry of Energy, the guaranteed electricity purchase tariff for types of renewable and clean energy are notified as follows: 29

30 Investment in Solar Energy (Photovoltaic) 30

31 31

32 Economic and technical Analysis, recycling CO2 in Ramin Power PlantFourth 32

33 Company Profile for Ramin Power Plant in Ahvaz Fuel Type Turbine Model Nominal Power Operation Time Number of Units Primary: Natural Gas Secondary: Mazut K300−240−24*3051979 − 19951 − 4 Primary: Natural Gas Secondary: MazutK300−240−12*3151998 − 19995 – 6 Total amount 1850 MW Address : north-east of Ahvaz - 20 k.m. Masjed Soleiman road - near Karun river and Vis town 33

34 34

35 Gas Electricity CO2 11000 Gwh 2700,000,000 M ^ 3 900,000 Ton Overview of Gas Consumption, produced Energy and recyclable CO2 from Power Plant (annually) 35

36 10 million cubic meters The Amount of daily consumed Gas 300 million cubic meters The Amount of Monthly consumed Gas 2700 million cubic meters The Amount of yearly consumed Gas 2 KGCO2 Production per cubic Meter of natural Gas Consumption 560 KGCO2 Production per MW of Power Generation 36

37 Total daily consumption of natural gas power plant 10 million cubic meters Natural gas consumption for producing each MW: 280 cubic meters Daily Amount of recyclable CO2 in Units: 1/5 million cubic meters Daily obtaining Amount of CO2 in Units: 3 thousand tons 37

38 38

39 Oil and Gas Industry Increasing in removal Oil Tanks Chemical Industry Producing Urea and Methanol Producing dry Ice Producing Firefighting Gas Welding & Foundry As the inert Gas Food Industry Carbonated beverages Quick and sudden drying 39

40 2994892 € Total Cost of initial Investment 351651 € Total annual operating expenses 66021 € Total Cost of raw Materials 35178 € Committee annual maintenance Fee 220134 € Total annual Cost of ancillary Facilities 17589 € Annual overhead Cost 41690 € General and administrative Costs per Year 4.7 Years Payback Period Purity% 99 / 9 40

41 Thank You sincerely for your close Attention 41