Presidency of the Islamic Republic of Iran Vice Presidency for Science and Technology Renewable Energy Technology Council Investment and Technological.

Similar presentations


Presentation on theme: "Presidency of the Islamic Republic of Iran Vice Presidency for Science and Technology Renewable Energy Technology Council Investment and Technological."— Presentation transcript:

1 Presidency of the Islamic Republic of Iran Vice Presidency for Science and Technology Renewable Energy Technology Council Investment and Technological Cooperation Opportunities in Renewable Energy of I.R.Iran S.Vatankhah Secretary-General 31.03.2016, Vienna

2 Introduction of the Council National Coordinator & Supervisor Monitor & Communicator among all governmental bodies Facilitator for private sector (KBCs) to localize & Commercialize RE Technologies 2

3 Policy of "Renewable Energy" in Iran National document for the development of knowledge-based renewable energy is passed: Achieving a 10% share of renewable power generation capacity installed in the country regarding the total in 2025; (10000 MW) Achieve a 1.5% share of renewable heat to the total heat consumption in next ten years; (10000 MW)

4 Current Situation of I.R.Iran 4

5 Wind Resource Assessment 5 سرعت باد در ارتفاع 80 متری

6 Solar Resource Assessment 6

7 Geothermal Resource Assessment 7

8 Biomass Resource Assessment 8 Maximum generated electricity potential from all types of biomass power plants for cities populated 250000 and above (30 cities) is more than 800MW including: 217 MW pyrolyze – gasification power plant, 311 MW waste incineration power plant, 159 MW anaerobic digest power plant and 112 MW landfill power plant.

9 Installed Renewable energy power plants situation Up to the end of JAN/2016 in Iran 9 Total Non-Governmental capacity (MW) Governmental Capacity (MW) Power plantItem 154.7655.998.860 Wind 1 7.9140.5147.4 Solar (PV) 2 10.5 0 Biomass 3 62.880.4462.4 Small Hydropower 4 236.05467.354168.46 Total Source: Renewable energy Organization of Iran (SUNA)

10 Wind energy

11 100 MW Wind power plant- Manjil ongoing… (27 × 300KW) (18 × 550 KW) (2 × 500 KW) (81× 660 KW) (1× 600KW)

12 28.4 MW Wind power plant- Binalood (43 × 660 KW) installed

13 Capacity Factor:45% 1.5MW in Khaf Area (Beheen Ertebat Mehr Co.)

14 Wind Atlas Project Project aims: 1- Creating digital information data base on wind energy potential in Iran 2- Calculating wind energy at the altitude higher than 40 Meters from the ground 3- Recognition of suitable regions for wind farms 4- 2.5 years data gathering in more than 110 locations 5- the acquired information is already available for public attention

15 Zabol wind power plant Number of turbines: 1 Capacity 660 kw Number of turbines: 1 Capacity 660 kw Number of turbines: 1 Capacity 660 kw Number of turbines: 1 Capacity 660 kw Number of turbines: 3 Capacity 1980kw Number of turbines: 1 Capacity 660 kw Isfahan wind power plant Mahshahr wind power plant Ardebil wind power plant Shiraz (Babakohi) wind power plant Tabriz (onebne ali) wind power plant

16 IRAN’s capability in manufacturing wind turbines Turbines with production line 1.SabaNiroo Company- 660KW 2.Mapna Company-2.5MW 3.Aivazian Company-600 KW 4.Niroo Research Instituate -2MW (ongoing)

17 17 know-how and Technology development for producing 2MW national wind turbine with co- operation of Mapna company

18 Solar energy

19 Shiraz CSP power Plant Completion of the optimal design of parabolic collectors and collectors farm. Fundamental and Detailed design of steam and oil cycles for the first time for a solar thermal power plant in Iran.

20 Laser test for mirror bending: Given executed efforts in bending and exerting modifications on mould, furnace and laser test device with bending precision has reached from 7 mill radian to less than 3 mill radian.. Achieving know-how for producing all the equipment parts of solar thermal power plant (parabolic trough)

21 Rural Electrification Rural Electrification SUNA has installed 600 pilot PV systems for electrification of some rural areas. With experience gained by these pilot projects, Tavanir is implementing the same projects with capacity of 2000 house-holds. Installed systems have 0.7 and 1.5 kW capacities because they can be widely used throughout the country based on experiences.

22 Village in Arbebil Rural electrification with PV systems for more than 1000 village house-holders Village in FarsVillage in Khalkhal Village in khozestan Village in FarsVillage in khozestan

23 30 kW grid connected in Taleghan 15 kW PV array in Semnan 12 kW PV array in Yazd Some grid-connected photovoltaic power plants in Iran

24 Geothermal energy

25 Development of the field and construction of Sabalan geothermal power plant  Installation of 5 MW pilot power plant (phase 1-ongoing)  Installation of 50 MW power plant (phase 2) (phase 2)  Explorative and Productive excavation  Preservation of environment through development of field.

26 Constructing four samples of geothermal heat pumps - In this project some samples of heat pump with required equipements have been installed in: -Rasht, Meshkinshahr, Taleghan, Ahvaz, Bandarabas, Tehran and Boushehr. -During one year, data gathering is fulfilled.

27 27 Holding know-how for designing & manufacturing heat pump systems and installation in various climates Place of geothermal heat pump and surrounding lands for installing earth coil in Bandar abbas city Place of geothermal heat pump and surrounding lands for installing earth coil in Rasht city Place of geothermal heat pump and surrounding lands for installing earth coil in Taleghan city Place of geothermal heat pump and surrounding lands for installing earth coil in Ahvaz city

28 Biomass energy

29 Biogas pilot in Saveh 460 KW

30 Shiraz and Mashhad biogas power plants Capacity:1 MW Capacity:660 KW

31

32 Fuel Cell Technology

33 Direct Methanol Fuel Cell By Mazandaran University Design and Construction MEA (Membrane Electrode Assemblies) by Engineering Research Centre of Isfahan

34 Design and production of 5 and 10 KW PEM fuel cell as CHP with the aim of localization of know-how

35 10KW PEM fuel cell Design and fabrication of polymer fuel cell with 10 kW of electricity and heat simultaneously. 35

36 Designing and manufacturing of 100 kW solid oxide fuel cell stack with aim of improving technical knowledge of these types of fuel cell. 36

37 Design and construction of testing system for fuel cells 37

38 Storage of hydrogen 25 Kw fuel cell system in Taleghan Grid electrolysis system 25 kw fuel cell

39 39 Guaranteed Renewable Electricity Purchase Tariffs

40 40 RowTechnology type Guaranteed electricity purchase tariff (€-ct/Kwh) 1 Biomass-landfill7 Biomass- The anaerobic digestion8 Biomass- incineration15 2 Wind farm above 50 megawatt capacity15 Wind farm with the capacity of 50 megawatt and less13 Wind with the capacity of 1 megawatt and less (allocated to the subscribers and limited to the distribution capacity) 10 3 Solar farm above 10 megawatt capacity25 Solar farm with the capacity of 10 megawatt and less23 Solar with the capacity of 100 kilowatt and less (allocated to the subscribers and limited to the distribution capacity) 17 Solar with the capacity of 20 kilowatt and less (allocated to the subscribers and limited to the distribution capacity) 14 4Geothermal (including excavation and equipment)15 5Turbo expanders5 6Waste Recycling in industrial processes16 7Small hydropower with the capacity of 10 MW and less10 8Other types of renewable and clean power plants except hydropower13 On the implementation of the legal obligations of Ministry of Energy, the guaranteed electricity purchase tariff for types of renewable and clean energy are notified as follows:

41 41 Some Remarks about Feed in Tariffs in 2015 (1394) 20 years contract Adjustable rate (inflation, exchange rate fluctuation) After the end of the contract: bilateral contracts, energy exchange, electricity market 18 months deadline for power plant deployment. Decreasing feed in tariffs in the future in proportion with increasing installed capacities. By 30% bonus for enjoying domestic capabilities (know-how, technology, equipment and production) The Renewable Energy Organization of Iran (SUNA) is responsible to take care of this policy in preparing tariff draft in the coming years.

42 Increasing the share of non-public sector participation in the country's electricity production portfolio by buying guaranteed renewable electricity permits of non-public sector for construction of renewable power plants up to the end of 31 JAN/2016 in Iran Total (MW) Geothermal (MW) Marine (waves) (MW) Small- hydro power (MW) Biomass (MW) Solar (MW) Wind (MW) Stage of progressNumber 65.394--0.4410.560.51453.88In Operation1 1429.5 7 --3.77-15.31410.5Exchanged contract of electricity purchase 2 8412.8 93 500.1522.2183.53226. 593 4930.4 5 Establishment permission 3 9907.8 57 Total issued permissions

43 Cooperation Areas with Austrian Partners Direct Investment in RE sector of I.R.Iran (projects, farms, free & special zones, …) Joint research Joint production Localization of RE technologies Joint tech. center: J.V Local production in Iran and global marketing Joint investment fund

44 Thanks for your kind attention 44