1 APRIL 10, 2015

2 Meeting Agenda  Prototype 2 Goals  Robust Connections Demo  System Diagnostics Tool Demo  Final Prototype Risk Mitigation  Final Presentation  Questions & Answers

3 Prototype 2

4 Goals  Complete Data Aggregation  Synthesize different types of inputs into one or more different types of outputs  Increase the amount of data flow  Robust Connections  Demonstrate transmission failure and unintentional disconnection recovery  Network components directly related can detect device disconnects  System Diagnostics  Expand status logging of components, graphical network topology tool, and diagnostics tool

5 Progress  Complete Data Aggregation  Extended Prototype 1 structure to add automatically generated data in order to demonstrate scalability  Robust Connections  Reconnection after network failure between connected components  System Diagnostics  Parse network logs to display topology graphically  Log aggregation and filtering

6 Robust Connections TEAM LEAD – LUKE WANG

7 System Diagnostics TEAM LEAD – MAX PAYTON

8 Challenges  Complete Data Aggregation  Bottlenecks in Azure Database queries  Moving to Worker Roles from VMs more difficult than expected  System Diagnostics  Azure database connection problems prevented integration with Application

9 Final Prototype

10 Mitigation Plan Estimated 150-160 hours of work left to our desired functionality Adjust deployment approach to launch one hospital per worker role. Make a request to increase available number of cores in Azure –currently capped at 20. For System Diagnostics database, reinstall database and further research Azure webapp to database connections

11 Final Presentation

12 Date & Location  Date: April 27th  Time: 4 PM  Location: McMurtry Auditorium

13 Format  Introduction of the Problem  Overview of the Framework Design  Demo an Application built on the Framework  Reflect on what we learned  The COMP 410 experience

14 Final Prototype  Efficiency  Recovery  Security  Extensibility  Testability

15 Final Prototype 1.High Volumes of Heterogeneous Data 2.Disconnections 3.Different Kinds of Devices 4.Human Interaction

16 Deliverables  Framework User Manual  Framework Code  Framework API Documentation  Example Application Project  Expect by May 6th