Presentation is loading. Please wait.

Presentation is loading. Please wait.

Case studies for week 1. Comparison of 2 case studies per subject in teams of 2.

Similar presentations


Presentation on theme: "Case studies for week 1. Comparison of 2 case studies per subject in teams of 2."— Presentation transcript:

1 Case studies for week 1. Comparison of 2 case studies per subject in teams of 2.

2 Beams. The angel building – new atrium roof beams, Islington EC1V 4AB Team 1 – beams

3 Beams. Bridge of Aspiration, Wilkinson Eyre, Covernt garden London

4

5 Trusses. Kingsland road rail bridge, East London, E2 8DA Team 2 - Trusses

6 Vierendeel Truss Bridge at Grammene, Belgium

7 Slabs. National Gallery, Mies van de Rohe Berlin Team 3 - slabs

8 Slabs. Queen Elisabeth hall foyer, Southbank centre, London

9 Cantilever. Zaha Hadid Aquatic Centre – diving boards, Olympic park Stratford Team 4 - cantilever

10 Cantilever. Vauxhall bus station, London

11 Cantilever. Richard Desmond Childrens Eye Clinic, Mile End hospital, Whitechapel Team 5 (cantilever extension from existing)

12 Palestra_Will Alsop, Architects, 197 Blackfriars Rd, London

13 Team 6 Balcony “The Rucksack House by Stefan Eberstadt” Köln, Leipzig 2004

14 Balcony Adelaide warf – queen bridge road

15 Wozoco, MVrRDV, Amsterdam

16 Neo Bankside, Southbank, London Team 7 – Highrise #1 (stability frame)

17 gerkin Stability systems in High-rise buildings. The Gherkin (Swiss Re bank), 30 St Mary Axe, London

18 Stability systems in High-rise buildings. The shard, Joiner Street, London SE1 Team 8 – Highrise # 2 (stability core)

19 Stability systems in High-rise buildings. Leadenhall Building (Cheese grater) – 122 leadenhall street, East London

20 Frames. Paleys Upon Pilers, Aldgate, London, Studio weave Team 9 – Frames

21 Frames. Bermondsey square bike store, London – Sarah Wigglesworth architects

22 Columns. Turbine hall columns, Tate modern, London Team 10 – Columns

23 Columns. 02 Arena /Millennium Dome, Greenwich Peninsula, SE10 0DX London

24 Columns Arnos grove station, London

25 Arches. Canary wharf tube station, London Team 11 – Arches

26 Arches. The Dodges Palace (Palazzo Ducale), Venice, Italy

27 Tower Bridge, London Team 12 – Suspended – bridges / cable net

28 Albert Bridge, Battersea, London


Download ppt "Case studies for week 1. Comparison of 2 case studies per subject in teams of 2."

Similar presentations


Ads by Google