Presentation is loading. Please wait.

Presentation is loading. Please wait.

Overall Data Processing Architecture EVLA timeline and priorities.

Similar presentations


Presentation on theme: "Overall Data Processing Architecture EVLA timeline and priorities."— Presentation transcript:

1 Overall Data Processing Architecture EVLA timeline and priorities

2 Proposal Preparation and Submission Observation Preparation Observation Scheduling Monitor and Control System AntennaFeedReceiverIF System Local Oscillator Fiber Optics Transmission System Correlator Image Pipeline Data Archive Data Post- Processing Figure 3.1. Principal EVLA Subsystems NRAO Data Management Group (e2e project) Canadian Partner EVLA Project Primary data flow Control and monitor flow CBE

3 Gustaaf van Moorsel Data Processing Architecture 18 July 2002 3 EVLA Schedule (Calendar years) Start installation of fiber optics cables on YQ4 2002 Prototype EVLA system lab integration and testQ1 2003 Install prototype EVLA system on EVLA Test Antenna Q2 2003 Subsystem CDRsQ4 2003 Start EVLA electronics production Q4 2003 Start retrofitting 7 antennas/year with new system Q2 2004 Start observing in “transition” modeQ2 2004 Test of prototype correlator on 3 or 4 antennasQ4 2005 Start outfitting new correlator room Q2 2006 Start tests of first correlator subset at VLA Q4 2006 First “shared-risk” science with new correlator subset Q2 2007 Last antenna retrofitted to EVLA design Q1 2008 New correlator declared “operational” Q1 2009 Last EVLA receiver installed Q1 2010

4 Gustaaf van Moorsel Data Processing Architecture 18 July 2002 4 Interfaces e2e – EVLA M&C Correlator (Backend)  Archive M&C System  Archive Observation scheduling  M & C System Pipeline and Post-processing

5 Gustaaf van Moorsel Data Processing Architecture 18 July 2002 5 Correlator  Archive Paced by correlator development Q1 2009 New correlator operational – required Q2 2007 First science with new correlator subset – highly desirable Q4 2006 Start test first correlator subset at VLA – desirable Q4 2005 Test correlator prototype - desirable

6 Gustaaf van Moorsel Data Processing Architecture 18 July 2002 6 M&C System  Archive Archive (and retrieve) monitor data Paced by antenna upgrades Q2 2004 Start observing in transition mode – required Q2 2003 Prototype system on EVLA test antenna – highly desirable Q1 2003 Prototype bench tests - desirable

7 Gustaaf van Moorsel Data Processing Architecture 18 July 2002 7 Scheduling  M&C System When to transition from ‘cards’ to new Observation Scheduling System? –Less of a ‘drop-dead’ date –Becomes more important as new M&C system gains importance –Q4 2006 Start test first correlator subset at VLA – highly desirable

8 Gustaaf van Moorsel Data Processing Architecture 18 July 2002 8 Pipeline and post- processing Required because: –Amount of data –EVLA specific requirements Q1 2009 new correlator operational – required Q2 2007 First science with new correlator subset – highly desirable Q4 2006 Test first correlator subset – desirable

9 Gustaaf van Moorsel Data Processing Architecture 18 July 2002 9 Priorities 1.Archive Monitor data – Q2 2003 / Q2 2004 Visibility data – Q2 2007 / Q1 2009 2.Observation scheduling – Q4 2006 3.Pipeline – Q2 2007 4.Observing preparation - TBD 5.Proposal preparation/submission - TBD


Download ppt "Overall Data Processing Architecture EVLA timeline and priorities."

Similar presentations


Ads by Google