Presentation is loading. Please wait.

Presentation is loading. Please wait.

March 2015doc.: IEEE 802.11-15/0469r1 SubmissionMark Hamilton, Spectralink, Corp.Slide 1 ARC Closing Report Date: 2015-03-12 Authors:

Similar presentations


Presentation on theme: "March 2015doc.: IEEE 802.11-15/0469r1 SubmissionMark Hamilton, Spectralink, Corp.Slide 1 ARC Closing Report Date: 2015-03-12 Authors:"— Presentation transcript:

1 March 2015doc.: IEEE 802.11-15/0469r1 SubmissionMark Hamilton, Spectralink, Corp.Slide 1 ARC Closing Report Date: 2015-03-12 Authors:

2 March 2015doc.: IEEE 802.11-15/0469r1 Submission Abstract This document is the closing report for ARC SC, March 2015, Berlin meeting Mark Hamilton, Spectralink, Corp.Slide 2

3 March 2015doc.: IEEE 802.11-15/0469r1 SubmissionMark Hamilton, Spectralink, Corp.Slide 3 Work Completed MIB Design Pattern work item –Considered first draft pattern guidelines document –Agreed to add some more examples, and some editorial changes –Still need to find names more distinct than “Enabled” and “Activated” –With the above done (especially the naming?) ready to circulate for comments –Will start to scrub existing usage for any missing patterns next time IETF/802 coordination update –No news Joint meeting with TGak, and 802.1 –Discussed how to model a DS implemented with 802.1Q bridges, in combination with 11ak bridging APs running GLK links.

4 March 2015doc.: IEEE 802.11-15/0469r1 SubmissionMark Hamilton, Spectralink, Corp.Slide 4 Teleconference(s) None

5 March 2015doc.: IEEE 802.11-15/0469r1 SubmissionMark Hamilton, Spectralink, Corp.Slide 5 May 2015 Plans Two standalone meeting slots planned: –Design Pattern for MIB attribute use –802.11 Architecture topics: DSAF, DS_SAP, Figure 5-1 et seq –DS/AP/Portal architecture discussions One joint session with TGak –11ak architecture discussions


Download ppt "March 2015doc.: IEEE 802.11-15/0469r1 SubmissionMark Hamilton, Spectralink, Corp.Slide 1 ARC Closing Report Date: 2015-03-12 Authors:"

Similar presentations


Ads by Google