Presentation is loading. Please wait.

Presentation is loading. Please wait.

Breuker Feb 01 2012 Overview of future East Area Programme T8 : 24 GeV/c (primary protons) 2-3 x 10**11 per PS cycle; T9 (new) : 15 GeV/c 10**6 per spill;

Similar presentations


Presentation on theme: "Breuker Feb 01 2012 Overview of future East Area Programme T8 : 24 GeV/c (primary protons) 2-3 x 10**11 per PS cycle; T9 (new) : 15 GeV/c 10**6 per spill;"— Presentation transcript:

1 Breuker Feb 01 2012 Overview of future East Area Programme T8 : 24 GeV/c (primary protons) 2-3 x 10**11 per PS cycle; T9 (new) : 15 GeV/c 10**6 per spill; T10 (new) : 12 GeV/c 10**6 per spill; The secondary beam lines provide hadrons, electrons and muons; Overlap in energy with the lowest SPS beam energies in EHN1; These are in view of energies and particle types unique test facilities and not available at FermiLab, DESY or anywhere elsewhere.

2 Breuker Feb 01 2012 Future Users T8 : Irradiation facilities for protons and “mixed field”; T9 : Test beam facility and CLOUD experiment; T10 : Test beam facility mainly for ALICE; other users are not excluded; The SPS test beams in EHN1 became more and more overbooked; the East Hall beams are an alternative; Several users are debugging their equipment in the East Hall before going to higher energies at the SPS.

3 Breuker Feb 01 2012 Number of Users (“Tests”) and Days per Year for the East Hall :

4 East Hall Test Beam Users T9 2010 - 2012 CALICE SDHCAL CALICE WDHCAL CALICE GRPC CALICE MMEGAS CLAS12 (MMEGAS / RICH for Jlab) CMS PLT (Pixel Lumi Telescope) COMPCALO (Compass ECAL Upgrade) FACTOR (Shaslik Calo + SiPM) Breuker Feb 01 2012

5 East Hall Test Beam Users T9 2010 – 2012 cont. CBM (Comp. Baryon Matter at GSI) EMR (Electron Muon Ranger, Scint. TK) PERDaix (Baloon Experiment) PANDA (GSI Experiment) IRCAL (Indian Neutrino Observatory) CryoBLM (LHC Beam Loss Monitors) CLIC CTF3 (Beam Loss Monitors) KLOE2 (GEM’s) Breuker Feb 01 2012

6 East Hall Test Beam Users T9 2010 -2012 cont. ASACUSA (AD3 Tracker) NA62 (Gigatracker) OPERA (Brick Calibration) Many come back each year … Breuker Feb 01 2012

7 Overbooking of SPS H6 and H8 in 2012 (2011 was similar) Double and Triple Overlaps in requested Beam-Line and in Time Days with Beam for FT : 190; from this we subtract the NA61 Ion run and TS/MD times which gives about 120 days; H6 requests sum up to 319 days; H8 requests sum up to 376 days. Breuker Feb 01 2012

8

9 Conclusion The East Area will have a bright Future Breuker Feb 01 2012


Download ppt "Breuker Feb 01 2012 Overview of future East Area Programme T8 : 24 GeV/c (primary protons) 2-3 x 10**11 per PS cycle; T9 (new) : 15 GeV/c 10**6 per spill;"

Similar presentations


Ads by Google