Presentation is loading. Please wait.

Presentation is loading. Please wait.

Doc.: IEEE 802.22-15/0028r00 SubmissionApurva N. Mody, BAE SystemsSlide 1 IEEE 802.22.1 Revision – Revised Timeline IEEE P802.22 Wireless RANs Date: 2015-11-08.

Similar presentations


Presentation on theme: "Doc.: IEEE 802.22-15/0028r00 SubmissionApurva N. Mody, BAE SystemsSlide 1 IEEE 802.22.1 Revision – Revised Timeline IEEE P802.22 Wireless RANs Date: 2015-11-08."— Presentation transcript:

1 doc.: IEEE 802.22-15/0028r00 SubmissionApurva N. Mody, BAE SystemsSlide 1 IEEE 802.22.1 Revision – Revised Timeline IEEE P802.22 Wireless RANs Date: 2015-11-08 Authors:

2 doc.: IEEE 802.22-15/0028r00 Submission Apurva N. Mody (BAE Systems) November 2015 IEEE P802.22.1 Advanced Beaconing Original Schedule and Timelines PAR Request Date: 05-Oct-2012 PAR Approval Date: 05-Dec-2012 PAR Expiration Date: 31-Dec-2016 Status: PAR for a Revision to an existing IEEE Standard

3 doc.: IEEE 802.22-15/0028r00 Submission IEEE P802.22.1 Advanced Beaconing Original Schedule and Timelines Some Delays in this Project for the following reasons FCC has issued the Notice of Proposed Rulemaking (NPRM) for the 3.5 GHz Band (3550 – 3700 MHz) for operation adjacent to the Radar Operational Bands The current co-existence mechanism defined in the NPRM for spectrum sharing with Radars is Spectrum Sensing. FCC is still working to create the requirements for the Spectrum Sensor Creating a specification for the Advanced Beacon for Radar and Communications Spectrum Sharing requires close work with the United States Department of Defense. This joint cooperation has been delayed. Apurva N. Mody (BAE Systems) November 2015

4 doc.: IEEE 802.22-15/0028r00 Submission 201520162017 57911 13 579 13579 Task Group formedX Functional RequirementsX Call for Proposals issuedXX Selection Criteria X X Technical/Informative ContributionsX Proposal presentations X Baseline proposal selected X Draft for 1 st letter ballot XX 1 st letter ballot completed X Comment Resolution XX 2 nd letter ballot completed X Comment Resolution and recirculation X Sponsor ballot X Comment Resolution and recirculation XX RevCom/NesCom Approval X IEEE P802.22.1 Advanced Beaconing Schedule and Timelines Apurva N. Mody (BAE Systems) November 2015

5 doc.: IEEE 802.22-15/0028r00 Submission IEEE P802.22.1 PAR in (http://www.ieee802.org/22/P802.22.1_revision_PAR_Approved.pdf)http://www.ieee802.org/22/P802.22.1_revision_PAR_Approved.pdf IEEE P802.22.1 Criteria for Standards Development (https://mentor.ieee.org/802.22/dcn/12/22-12-0084-05-0001-advanced-beaconing- 5c.docx)https://mentor.ieee.org/802.22/dcn/12/22-12-0084-05-0001-advanced-beaconing- 5c.docx IEEE Std.802.22-2011 The United States President's Council of Advisors on Science and Technology (PCAST) report that promotes spectrum sharing between federal and commercial systems can be found at the following URL: PCAST Report - Report to the President - Realizing Full Potential of the Govt. held Spectrum to Spur Economic Growth 2 http://www.whitehouse.gov/sites/default/files/microsites/ostp/pcast_spectrum_rep ort_final_july_20_2012.pdf http://www.whitehouse.gov/sites/default/files/microsites/ostp/pcast_spectrum_rep ort_final_july_20_2012.pdf FCC Proceeding 15-47, GN Docket Number 12-354 – Report and Order and Seocond Further Notice of Proposed Rulemaking - Amendment of the Commission’s Rules with Regard to Commercial Operations in the 3550-3650 MHz Band. https://apps.fcc.gov/edocs_public/attachmatch/FCC-15-47A1.pdfhttps://apps.fcc.gov/edocs_public/attachmatch/FCC-15-47A1.pdf Apurva N. Mody, BAE SystemsSlide 5 References


Download ppt "Doc.: IEEE 802.22-15/0028r00 SubmissionApurva N. Mody, BAE SystemsSlide 1 IEEE 802.22.1 Revision – Revised Timeline IEEE P802.22 Wireless RANs Date: 2015-11-08."

Similar presentations


Ads by Google