Presentation is loading. Please wait.

Presentation is loading. Please wait.

1. 2 1.Review and Discuss QA Program Requirements. 2. Re-visit the importance of Team Building as an integral role in the QA Program Activities. 3. Provide.

Similar presentations


Presentation on theme: "1. 2 1.Review and Discuss QA Program Requirements. 2. Re-visit the importance of Team Building as an integral role in the QA Program Activities. 3. Provide."— Presentation transcript:

1 1

2 2 1.Review and Discuss QA Program Requirements. 2. Re-visit the importance of Team Building as an integral role in the QA Program Activities. 3. Provide an overview of enhancements to both the FSA Assessments and ISIR Analysis Tool.

3 3

4 4 ISIR Analysis Tool 2005-2006 Requirements Provide update via E-mail Use the ISIR Analysis Tool to Analyze your Data and update criteria If necessary Maintain Documentation In school file

5 5 A “Team” is defined as a group of people working towards a common goal. Therefore, “Team Building” is the process of enabling that group of people to reach their goal.

6 6 It is a fact! People working as a team can achieve better results than individuals working alone. Case Study

7 7 Conflicting Data has always been a confusing issue for schools. Your school has decided to take a closer look at Conflicting Data and how it is resolved at your school. To help with this, the school decided to complete the Conflicting Data Activity Found in the Verification Assessment. Knowing that the sources of Conflicting Data probably involve more than one office, several questions come to mind.

8 8 1.Who should we ask to be involved in the Conflicting Data Activity? 2. How do we develop the team? 3. What is the best way to make the process as productive as we can? 4. What is the best way to get this process going? TOOL: Team Problem Solver Web Site: http://www.teambuildinginc.com/tps/002.htm

9 9

10 10 WEB DEMONSTRATION

11 11 FSA Assessments FSA Assessments

12 12 1 2 3  Update With Assessments To Be Completed  Interactive ME Effective Practices  Updated Links to Hand Book On-Line Notification FORMS LINKS

13 13 Management Enhancement Effective Practice

14 14

15 15

16 16 Identified as Important by FSA Accuracy Enhances Program Integrity FSA Assessment Activities to Assist Schools Conflicting Data Professional Judgment

17 17 Prepare for An Audit or Program Review Fix Recurring Problems Continuously Assess Title IV Operations Meet your 05-06 QA Requirements

18 18 ISIR Analysis Tool Don’t forget to select the correct Version 2005-2006

19 19 In 2005-06 you will determine how effective your Institutional Verification Criteria is at your school

20 20 1 Prepare your Flat ASCII File  1,500 ISIR Records  Field Length now 16  No Filler Needed

21 21 Maximum 10,000 RecordsThe tool can randomly select and load up to 1,500 ISIR’s. Maximum Field Length is 16The extra field option is intended to identify records that met your school’s institutional verification criteria. The extra field can be blank or populated with a “Y” for Yes. For example: 044112222LA0104Y Auto-Load Feature available. Export Function a useful option.

22 22

23 23 2 Menu Updates  Data Request  User Specified Fields  Current Status  Student Listing  Export  Data Validation  Data Analysis

24 24

25 25

26 26

27 27

28 28

29 29

30 30

31 31

32 32 3 REPORTS  Field Increment Report  Verification Tracking Flag Report (NEW)  Field Change Report (NEW LINK-EFC Critical Fields)  Verification Summary Report

33 33

34 34

35 35

36 36

37 37

38 38

39 39

40 40 Why is the Sample Size Different?

41 41

42 42

43 43 4 New FILTERS  Estimated Filers  Pell Eligibility  Pell Changed  EFC Changes  Field Increments

44 44

45 45

46 46

47 47

48 48 Create User-Specified Field (1) to track records where institutional Criteria was applied. Upload user specified data to populate user specified Field #1of those records that met your school’s Institutional verification criteria

49 49 2005-2006 QA Program Requirements What’s New With -ISIR Analysis Tool -FSA Assessments The Value of Teams

50 50 Visit the QA Website Ifap.ed.gov/qualityassurance Team building site: http://www.teambuildinginc.com/tps/002.htm http://www.teambuildinginc.com/tps/002.htm GPO Website to search for prior regulations: http://www.gpoaccess.gov/cfr/index.html http://www.gpoaccess.gov/cfr/index.html IF YOU HAVE PROBLEMS WITH THE ISIR TOOL, YOU MAY CONTACT CPS CUSTOMER SUPPORT AT 1-800- 330-5947

51 51 QA Regional Contacts Regions 1, 2, 5 Holly Langer-Evans |Holly.Langer- Evans@ed.govHolly.Langer- Evans@ed.gov Regions 3, 4, 6, 7 Anne Tuccillo | Anne.Tuccillo@ed.gov Sharyn Hutson | Sharyn.Hutson@ed.govAnne.Tuccillo@ed.govSharyn.Hutson@ed.gov Regions 8, 9, 10 Michael Cagle | Michael.Cagle@ed.govMichael.Cagle@ed.gov


Download ppt "1. 2 1.Review and Discuss QA Program Requirements. 2. Re-visit the importance of Team Building as an integral role in the QA Program Activities. 3. Provide."

Similar presentations


Ads by Google